Research Article

Integrating Frequency Setting, Timetabling, and Route Assignment to Synchronize Transit Lines

Table 4

Numerical results for scenarios C.

Costs ($)

Operation1,703,8061,627,7131,734,3881,603,9681,190,7661,214,534
Trips2,182,6962,182,7002,182,7002,188,4402,182,7002,188,990
Walk19,63619,63619,63623,90619,63626,601
Holding0134,411240,540142,510367,714375,586
First wait2,221,525405,696618,411412,922903,477602,113
Transfer wait272,46671,27559,56152,45331,24081,863

Total Cost6,400,1294,441,4314,855,2364,424,1994,695,5334,489,687