Research Article
Railway Safety Risk Assessment and Control Optimization Method Based on FTA-FPN: A Case Study of Chinese High-Speed Railway Station
Table 5
Control Methods for Risk factors.
| Risk source | Control methods |
| P14, P10 | (1) Set warning signs. (2) Strengthen publicity. (3) Regular patrol. | P5 | More training and education. | P6 | (1) Organize relevant tests. (2) Forbid unauthorized posts change and untrained staff working. | P2 | (1) Effective ticket inspection. (2) Add staff for guidance. (3) Strict operation standards and reliable insurance. | P3 | Add staff for guidance. | P4 | (1) Add exit and strengthen guidance. (2) Forbid passengers entering station by exit. (3) Set posts at exits. | P1 | (1) Immediate report and emergency response. (2) Add staff for inspection. | P8 | (1) Set warning signs. (2) Strengthen publicity. (3) Set posts at escalators. (4) Strengthen maintenance. | P11 | (1) Add staff. (2) Set instruction signs. | P13 | (1) More education or simulation of emergency response. (2) Immediate and effective emergency response process. | P12 | (1) Add staff. (2) Set instruction signs. |
|
|