Control Methods for Risk factors.

Risk sourceControl methods

P14, P10(1) Set warning signs.
(2) Strengthen publicity.
(3) Regular patrol.
P5More training and education.
P6(1) Organize relevant tests.
(2) Forbid unauthorized posts change and untrained staff working.
P2(1) Effective ticket inspection.
(2) Add staff for guidance.
(3) Strict operation standards and reliable insurance.
P3Add staff for guidance.
P4(1) Add exit and strengthen guidance.
(2) Forbid passengers entering station by exit.
(3) Set posts at exits.
P1(1) Immediate report and emergency response.
(2) Add staff for inspection.
P8(1) Set warning signs.
(2) Strengthen publicity.
(3) Set posts at escalators.
(4) Strengthen maintenance.
P11(1) Add staff.
(2) Set instruction signs.
P13(1) More education or simulation of emergency response.
(2) Immediate and effective emergency response process.
P12(1) Add staff.
(2) Set instruction signs.