Research Article

Bilevel Programming for Traffic Signal Coordinated Control considering Pedestrian Crossing

Table 3

Data of intersection and optimized results.

IntersectionFlow (pcu/h)Left-turn ratioRight-turn ratioPedestrian flow (ped/h)Optimized
Green time (N-S) (s)Offset (s)

Beijing East Road–Taiping North RoadN4200.210.29135263
S2300.70.3537
W74600.2433935
E134
Sipailou Road–Taiping North RoadN58300.1814785
S5370.320209
W2850.360.64614104
E
Wendui Bridge–Taiping North RoadN41200146283
S56400253
W1030.330.6763821
E
Zhujiang Road–Taiping North RoadN6920.320.06189264
S4320.120.351379
W7720.100.169603
E7500.270.051053
Changjiang Back Street–Taiping North RoadN13240.130.2159065
S12090.040.09816
W3010.350.29128384
E1800.430.261720
Shi Po Po–Taiping North RoadN11900.240.062458
S8910.320.16528
W2890.140.3373033
E
Changjiang Road–Taiping North RoadN9320.130.19162561
S12090.190.201793
W5090.100.21201913
E7340.320.111831
Zhongshan East Road–Taiping North RoadN17230.120.32203266
S14390.230.171208
W18870.110.321902
E20310.220.162319