Research Article
Bilevel Programming for Traffic Signal Coordinated Control considering Pedestrian Crossing
Table 3
Data of intersection and optimized results.
| Intersection | | Flow (pcu/h) | Left-turn ratio | Right-turn ratio | Pedestrian flow (ped/h) | Optimized | Green time (N-S) (s) | Offset (s) |
| Beijing East Road–Taiping North Road | N | 420 | 0.21 | 0.29 | 1352 | 63 | | S | 230 | 0.7 | 0.3 | 537 | | W | 746 | 0 | 0.24 | 339 | 35 | E | — | — | — | 134 | Sipailou Road–Taiping North Road | N | 583 | 0 | 0.18 | 147 | 85 | S | 537 | 0.32 | 0 | 209 | W | 285 | 0.36 | 0.64 | 614 | 104 | E | — | — | — | — | Wendui Bridge–Taiping North Road | N | 412 | 0 | 0 | 1462 | 83 | S | 564 | 0 | 0 | 253 | W | 103 | 0.33 | 0.67 | 638 | 21 | E | — | — | — | — | Zhujiang Road–Taiping North Road | N | 692 | 0.32 | 0.06 | 1892 | 64 | S | 432 | 0.12 | 0.35 | 1379 | W | 772 | 0.10 | 0.16 | 960 | 3 | E | 750 | 0.27 | 0.05 | 1053 | Changjiang Back Street–Taiping North Road | N | 1324 | 0.13 | 0.21 | 590 | 65 | S | 1209 | 0.04 | 0.09 | 816 | W | 301 | 0.35 | 0.29 | 1283 | 84 | E | 180 | 0.43 | 0.26 | 1720 | Shi Po Po–Taiping North Road | N | 1190 | 0.24 | 0.06 | 24 | 58 | S | 891 | 0.32 | 0.16 | 528 | W | 289 | 0.14 | 0.33 | 730 | 33 | E | — | — | — | — | Changjiang Road–Taiping North Road | N | 932 | 0.13 | 0.19 | 1625 | 61 | S | 1209 | 0.19 | 0.20 | 1793 | W | 509 | 0.10 | 0.21 | 2019 | 13 | E | 734 | 0.32 | 0.11 | 1831 | Zhongshan East Road–Taiping North Road | N | 1723 | 0.12 | 0.32 | 2032 | 66 | S | 1439 | 0.23 | 0.17 | 1208 | W | 1887 | 0.11 | 0.32 | 1902 | | E | 2031 | 0.22 | 0.16 | 2319 | |
|
|