Research Article
Modeling and Simulation of Cascading Failures in Transportation Systems during Hurricane Evacuations
Table 3
Calibration results of selected intersection.
| Intersection | Approaches | Synchro | SUMO | Delay (s) | V/C ratio |
| Broadway and Franklin Street | Broadway (T) | 804 | 893 | 44.7 | 0.98 | Broadway (L) | 89 | Franklin (T) | 416 | 448 | 43.8 | 0.98 | Franklin I | 32 |
|
|