Research Article

Evaluation of the Cost of Intelligent Upgrades of Transportation Infrastructure for Intelligent Connected Vehicles

Table 2

Attribute parameters of the closed highway scenario.

ParameterValue

Road length (km)148.2
Traffic flow in one lane (number of vehicles/m)0.02
Number of lanes (two directions)6
The year construction started1998
Investment¥3,000,000,000