Research Article

First-Train Timetable Synchronization in Metro Networks under Origin-Destination Demand Conditions

Table 3

Feasible route of OD demand from stations 1 to 10.

Departure times and travel timeRoute r1Route r2
Minimum caseMaximum caseMinimum caseMaximum case

Departure time of the first train at thestarting station on each line1D5:505:505:505:50
2D5:565:595:556:00
3U5:576:15
4U6:006:06
Travel time33576072