Research Article

Best Piecewise Monotonic Data Approximation in Overhead and Underground Medium-Voltage and Low-Voltage Broadband over Power Lines Networks: Theoretical and Practical Transfer Function Determination

Table 2

Indicative processing time of best L1PMA for distribution BPL networks (OV: overhead; UN: underground).

Urban case AUrban case BSuburban caseRural case“LOS” case
Processing time (s)FigureProcessing time (s)FigureProcessing time (s)FigureProcessing time (s)FigureProcessing time (s)Figure

OVMVWtG12.230 Figure 8(a)2.477Figure 8(b)2.291Figure 8(c)2.407Figure 8(d)2.569Figure 8(e)
OVLVWtG12.653Figure 9(a)3.107Figure 9(b)2.539Figure 9(c)2.677Figure 9(d)2.677Figure 9(e)
UNMVStP12.644Figure 10(a)2.572Figure 10(b)2.501Figure 10(c)2.624Figure 10(d)2.943Figure 10(e)
UNLVStP12.420Figure 11(a)2.774Figure 11(b)2.592Figure 11(c)2.648Figure 11(d)2.792Figure 11(e)