Research Article

Numerical Well Test Analysis for Polymer Flooding considering the Non-Newtonian Behavior

Table 4

Details of the well tests.

NameTest1Test2

Date of test2010/04/192012/04/15
WellProducer 1Producer 1
Well test methodPressure build-upPressure build-up
Time of stable production, day150150
Liquid rate of stable production, m3/day7430
Time of well shutdown, day3.013.09
Measured concentration of polymer in the production well, kg/m30.0090.85