Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem

1Guangxi Key Laboratory of New Energy and Building Energy Saving, Guilin University of Technology, Guilin 541004, China
2College of Mechanical and Control Engineering, Guilin University of Technology, Guilin 541004, China
3College of Information Science and Engineering, Guilin University of Technology, Guilin 541004, China

Received 14 July 2015; Revised 11 September 2015; Accepted 14 September 2015

Academic Editor: Petko Petkov

Copyright © 2015 Lieping Zhang et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

How to Cite this Article

Lieping Zhang, Yingxiong Luo, and Yu Zhang, “Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem,” Journal of Control Science and Engineering, vol. 2015, Article ID 923791, 6 pages, 2015. https://doi.org/10.1155/2015/923791.