Research Article

Decentralized Scheduling Algorithm for DAG Based Tasks on P2P Grid

Table 3

Specifications of nodes , , , and .

Node name
(origin node)

Number of PE2343
MIPS of single PE (seconds)1.21.00.91.4
Round trip time (seconds)0.10.40.20.4
Window size (Kb)75.0100.075.0100.0