Research Article
Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México
Table 5
Allowance percentage determined from the study for each operator.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note: (1) % Obtained from job severity of the sampled periods (2) % Allowance according to job severity. |