Research Article

Effect of Emission Penalty and Annual Interest Rate on Cogeneration of Electricity, Heat, and Hydrogen in Karachi: 3E Assessment and Sensitivity Analysis

Table 2

Specifications and price of equipment.

ComponentCost ($)Specifications
CapitalReplacementOperation and maintenance

PV [69]2000200010Lifetime: 25 years
Derating factor: 80%
Slope: 24.15o
Wind turbine [70]5000400050Type: WES 5 Tulipo
Rated power: 2.5 kW AC
Lifetime: 25 years
Hub height: 25 m
Cut-in speed: 2 m/s
Battery [70]1200110050Type: Surrette 6CS25P
Lifetime: 9645 kWh
Converter [69]3003000Lifetime: 20 years
Inverter efficiency: 95%
Rectifier efficiency: 95%
Fuel cell [71]300025000.02Lifetime: 40000 h
Min. load ratio: 25%
Efficiency: 90%
Heat recovery ratio: 25%
Electrolyzer [71]50025010Lifetime: 20 years
Min. load ratio: 0%
Efficiency: 85%
Hydrogen tank [69]57457410Lifetime: 25 years
Initial tank level: 20%
Boiler [72]Efficiency: 85%
Carbon monoxide 6.5 g/L
Unburned hydrocarbons 0.72 g/L
Particulate matter 0.49 g/L
Fuel sulfur converted to PM 2.2%
Nitrogen oxides 58 g/L