Multiobjective Optimization Approach for Coordinating Different DG from Distribution Network Operator

Table 2

The simulation results of different interval number.

Interval number of load, PV, windEffective joint-state numberSmall probability eventsExpected value of , , (kW)

(5, 5, 5)1012430.56, 19.96, 47.99
(10, 10, 10)33266830.54, 19.96, 47.85
(15, 15, 15)237313830.54, 19.96, 47.83
(20, 20, 20)198780230.54, 19.96, 47.82
(25, 25, 25)2541537130.54, 19.96, 47.82
(30, 30, 30)2962670430.54, 19.96, 47.82
(35, 35, 35)3144256130.54, 19.96, 47.81
(5, 5, 10)1678330.56, 19.96, 47.85
(5, 5, 15)21715830.56, 19.96, 47.83
(5, 5, 20)26423630.56, 19.96, 47.82
(5, 5, 30)34340730.56, 19.96, 47.82
(10, 20, 30)170583030.54, 19.96, 47.82