Research Article

Optimal Connection of Offshore Wind Farm with Maximization of Wind Capacity to Power Systems considering Losses and Security Constraints

Table 6

Allocated capacity (MW) for each penetration and candidate connection, case 2.

(%)Allocated capacity

1.0100.460.000.00
2.0200.930.000.00
3.0301.390.000.00
3.1311.440.000.00
3.2321.490.000.00
3.3331.530.000.00
3.4341.580.000.00
3.5351.630.000.00
3.6361.670.000.00
3.7371.720.000.00
3.8381.770.000.00
3.9391.810.000.00