Dual-directional primary and backup relay operating times for quaternary scheme in grid-connected microgrid.

DG operating statusFault locationOperating times (t) of relay in second
(Rp = primary relay; Rb = backup relay)
RpRb1Rb2

Status 1F-1R1R6R5
0.0990.3990.410
R2R3R4
0.1630.4530.466
F-2R3R2R1
0.1390.4400.454
R4R5R6
0.0990.4080.421
F-3R5R4R3
0.1190.4250.440
R6R1R2
0.1240.4660.475

Status 2F-1R1R6R5
0.0990.4050.418
R2R3R4
0.1570.4730.492
F-2R3R2R1
0.1460.4500.463
R4R5R6
0.0990.3930.412
F-3R5R4R3
0.0990.3940.404
R6R1R2
0.1260.5800.601

Status 3F-1R1R6R5
0.1040.4120.425
R2R3R4
0.1670.4680.472
F-2R3R2R1
0.1530.4610.478
R4R5R6
0.0990.4040.417
F-3R5R4R3
0.1020.4480.466
R6R1R2
0.1290.4610.474