Voltage profile before the connection of the new DG, after the connection at CB1, with and without the proposed method.
| ā | Before the connection of the new DG at CB1 | After the connection of the DG at CB1 | Without the proposed method | With the application of the proposed method |
| Structure 1 | | 0.98 | 1.06 | 1.05 | | 0.97 | 1.00 | 1.01 |
| Structure 2 | | 0.97 | 1.05 | 1.03 | | 0.92 | 0.96 | 0.97 |
| Structure 3 | | 0.97 | 1.10 | 1.06 | | 0.92 | 0.99 | 0.99 |
|
|