Research Article

Optimal Allocation of Combined Renewable Distributed Generation and Capacitor Units for Interconnection Cost Reduction

Table 5

Voltage profile before the connection of the new DG, after the connection at CB1, with and without the proposed method.

ā€‰Before the connection of the new DG at CB1After the connection of the DG at CB1
Without the proposed methodWith the application of the proposed method

Structure 10.981.061.05
0.971.001.01

Structure 20.971.051.03
0.920.960.97

Structure 30.971.101.06
0.920.990.99