Research Article
Preventive Control Strategy of Cascading Fault considering Safety and Economy
Table 4
Preventive control optimization results.
| Generator no. | L15-16 | L21-22 | L15-16; L21-22 |
| G30 | 881.93 | 899.31 | 477.33 | G32 | 634.51 | 581.78 | 166.43 | G33 | 168.36 | 389.95 | 639.32 | G34 | 250.43 | 558.72 | 506.11 | G35 | 714.05 | 562.74 | 503.09 | G36 | 218.75 | 268.34 | 286.76 | G37 | 550.46 | 624.76 | 962.73 | G38 | 885.92 | 631.39 | 354.63 | G39 | 860.50 | 631.85 | 832.60 | Safety margin | 9.17 | 8.73 | 8.55 | Generation cost | 1101.12 | 1085.34 | 1051.16 |
|
|