Research Article

Rolling Scheduling Method considering Shiftable Demand Respond Resources

Figure 7

Adjusted power in the intraday scheduling. (a) Difference between day-ahead and intraday forecasting error. (b) Adjusted power of Method 2. (c) Adjusted power of Method 3 (the proposed method).
(a)
(b)
(c)