Research Article
Techno-Economic Comparisons of HVAC and Simultaneous AC-DC Transmission
Table 3
400 kV double circuit HVAC investment cost
| Item | Total cost (USD) |
| Transmission line cost from Tana Beles to Sululta | 255,065,116.51 | Tana Beles switchyard upgrading | 6,238,633.51 | Sululta substation upgrading | 13,439,557.28 | Total cost | 274,743,307.30 | Engineering and administration (5% of the total cost) | 13,737,165.37 | Total project cost | 288,480,472.67 | Physical contingency (5% of the total cost) | 14,424,023.63 | Price contingency (10% of the total project cost) | 28,848,047.27 | Grand total | 331,752,543.56 |
|
|