Research Article

AHP-FSE-Based Risk Assessment and Mitigation for Slurry Balancing Shield Tunnel Construction

Table 5

Shield tunneling workload.

NumberContentsUnit workload (step)Total workloadRemarks

1Shield distance2 m3353.945 mWhole tunnel
2Excavated Earth volume211.37 m3352622.8 m3Whole tunnel
3Synchronous grouting22.92 m3∼25.79 m338438.6 m3∼43243.4 m3160% to 180% of theoretical building gap (theoretical 14.33 m3/step)
4Replication slurryDepending on the actual situation