Research Article

Application of Systems Simulation for Predicting and Optimising Energy Requirements for HDF Production

Table 3

Production data for the three main production lines.

Line 1 production unitsLine 2 production unitsFinish line production units

Actual totals1174112391643870
simulation totals
 Run 11214412969649120
 Run 21226412789639540
 Run 31208512214635040
 Run 41212712401663560
 Run 51188012565659690

Average1210012588649390
Average/actual (%)103.06%101.59%100.86%