The Extension of Auxiliary Problem Principle for Solving Dynamic Economic Dispatch Problem in Power Systems
Table 1
The data refer to generation units [
15].
| Unit | P max (MW) | P min (MW) | a ($/MW2h) | b ($/MWh) | c ($/h) | Ur (MW/hour) | Dr (MW/hour) |
| 1 | 470 | 150 | 0.00043 | 21.6 | 958.2 | 80 | 80 | 2 | 460 | 135 | 0.00063 | 21.05 | 1313.6 | 80 | 80 | 3 | 340 | 73 | 0.00039 | 20.81 | 604.07 | 80 | 80 | 4 | 300 | 60 | 0.0007 | 23.9 | 471.6 | 50 | 50 | 5 | 243 | 73 | 0.00079 | 21.620 | 480.29 | 50 | 50 | 6 | 160 | 57 | 0.00056 | 17.87 | 601.75 | 50 | 50 | 7 | 130 | 20 | 0.00211 | 16.51 | 502.7 | 30 | 30 | 8 | 120 | 47 | 0.0048 | 23.23 | 639.4 | 30 | 30 | 9 | 80 | 20 | 0.10908 | 19.58 | 455.6 | 30 | 30 | 10 | 55 | 55 | 0.00951 | 22.54 | 692.4 | 30 | 30 |
|
|