Table of Contents
Journal of Mining
Volume 2014, Article ID 618719, 9 pages
http://dx.doi.org/10.1155/2014/618719
Research Article

Rock Load Estimation in Development Galleries and Junctions for Underground Coal Mines: A CMRI-ISM Rock Mass Rating Approach

1CSIR-Central Institute of Mining and Fuel Research, Dhanbad 826 015, India
2Mining Engineering Department, Indian School of Mines, Dhanbad 826004, India

Received 27 August 2013; Accepted 19 December 2013; Published 9 March 2014

Academic Editor: Manoj Khandelwal

Copyright © 2014 Avinash Paul et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Abstract

Rock mass rating (RMR) plays important role in design and selection of support system (Ghosh, 2000). For stability assessment of rock mass it is very important to know the amount of rock load mobilized around the development gallery which is estimated using RMR (Singh et al., 2003, Barton et al., 1974, Bieniawski, 1984, and Ghosh et al., 1992). In Indian coal mines, Central Mining Research Institute-Indian School of Mines rock mass rating (herein after referred to as CMRI-ISM RMR) is mostly used for formulating design guidelines for supports. In this paper an attempt has been made to correlate CMRI-ISM RMR values and rock load of galleries and junctions for different gallery widths, ranging from 3.6 m to 4.8 m, at different densities of roof rocks. The proposed empirical expression can help in quick design of support system for underground coal mines working in the same regime.