Research Article
Dynamic Analysis of the High Speed Train and Slab Track Nonlinear Coupling System with the Cross Iteration Algorithm
Table 1
Parameters for China high speed train CRH3.
| Parameters | Value | Parameters | Value |
| Mass of car body 2 (kg) | 40000 | Damping of primary suspension system 2 (KN⋅s/m) | 100 | Mass of bogie 2 (kg) | 3200 | Damping of secondary suspension system 2 (kN⋅s/m) | 120 | Mass of wheel (kg) | 1200 | Wheelbase 2 (m) | 2.50 | Pitch inertia of car body 2 (kg⋅m2) | 5.47 × 105 | Distance between center of front bogie and center of rear bogie 2 (m) | 17.375 | Pitch inertia of bogie 2 (kg⋅m2) | 6800 | Stiffness of wheel/rail contact (MN/m) | 1.325 × 103 | Stiffness of primary suspension system 2 (MN/m) | 2.08 | Axle load (kN) | 140 | Stiffness of secondary suspension system 2 (MN/m) | 0.8 | Length of vehicle (m) | 25.675 |
|
|