Active and reactive loads on IEEE 123-bus for simulation I (minimum load) and simulation II (maximum load).

Bus numberPhasesActive load of simulation I (kw)Active load of simulation II (kw)Reactive
load (kVar)
Load typeBus numberPhasesActive load of simulation I (kw)Active load of simulation II (kw)Reactive
load (kVar)
Load type

1a303720Wye62c253920Wye
2b121910Wye63a273920Wye
4c263820Wye64b507535Wye
5c131910Wye65a233525Delta
6c253820Wye65b243525Delta
7a141910Wye65c526950Delta
9a243820Wye66c527235Wye
10a132010Wye68a122010Wye
11a264020Wye69a254020Wye
12b142010Wye70a132010Wye
16c263920Wye71a264020Wye
17c122010Wye73c274020Wye
19a263820Wye74c284020Wye
20a263920Wye75c283820Wye
22b253920Wye76a6210480Delta
24c264020Wye76b467050Delta
28a284020Wye76c457050Delta
29a283920Wye77b264020Wye
30c243920Wye79a274020Wye
31c132010Wye80b304020Wye
32c142010Wye82a293820Wye
33a264020Wye83c122010Wye
34c254020Wye84c131910Wye
35a284020Delta85c254020Wye
37a283920Wye86b132010Wye
38b121910Wye87b274020Wye
39b132010Wye88a294020Wye
41c121910Wye90b293920Wye
42a132010Wye92c244020Wye
43b254020Wye94a264020Wye
45a151910Wye95b142010Wye
46a141910Wye96b132010Wye
47a, b, c6410375Wye98a264020Wye
48a, b, c137202150Wye99b304020Wye
49a233525Wye100c283920Wye
49b456950Wye102c122010Wye
49c233520Wye103c273920Wye
50c293920Wye104c263920Wye
51a151910Wye106b254020Wye
52a254020Wye107b254020Wye
53a264020Wye109a294020Wye
55a132010Wye111a152010Wye
56b132010Wye112a112010Wye
58b132010Wye113a254020Wye
59b151910Wye114a132010Wye
60a141910Wye