Research Article
One-Sided and Two-Sided w-of-w Runs-Rules Schemes: An Overall Performance Perspective and the Unified Run-Length Derivations
Table 9
The steady-state initial probability vectors of the one-sided and two-sided NSS w-of-w SRR and IRR schemes.
|