The Prospect of Solar Energy in the Development of Power Stations in the State of Kuwait

Table 1

The LCOE for 100 MW PV and CCGT power stations.

TechnologyPhotovoltaicCCGT

Plant capacity100 MW100 MW
Fuel usedNatural gas
Cost of fuel at $50/bb ($/kWh)0.08
Investment cost ($/kWh)5,0001,400
O&M cost ($/kW/yr)15035
CO2 emission cost ($/kWh)0.024
Efficiency rate10%50%
Load factor85%
Project life2530
Duration of construction23

LCOE ($/kWh) at 5% Interest rate$0.19$0.11
LCOE ($/kWh) at 10% Interest rate$0.28$0.13

Sources: International energy agency [8], Ministry of electricity and water in Kuwait [9].