Research Article
The Prospect of Solar Energy in the Development of Power Stations in the State of Kuwait
Table 1
The LCOE for 100 MW PV and CCGT power stations.
| Technology | Photovoltaic | CCGT |
| Plant capacity | 100 MW | 100 MW | Fuel used | — | Natural gas | Cost of fuel at $50/bb ($/kWh) | — | 0.08 | Investment cost ($/kWh) | 5,000 | 1,400 | O&M cost ($/kW/yr) | 150 | 35 | CO2 emission cost ($/kWh) | — | 0.024 | Efficiency rate | 10% | 50% | Load factor | — | 85% | Project life | 25 | 30 | Duration of construction | 2 | 3 |
| LCOE ($/kWh) at 5% Interest rate | $0.19 | $0.11 | LCOE ($/kWh) at 10% Interest rate | $0.28 | $0.13 |
|
|
Sources: International energy agency [8], Ministry of electricity and water in Kuwait [9].
|