Research Article
Case Study of Integrating an Offshore Wind Farm with Offshore Oil and Gas Platforms and with an Onshore Electrical Grid
Table 5
Maximum wind power for integration to each platform individually.
| Platform number | Main electrical power generation | Main bus | Maximum wind power (1 GT connected) | Maximum wind power (2 GT connected) |
| Platform 1 | 3 * 23 MW + 19.4 MW | 13.8 kV, 60 Hz | 10 MW | 19 MW | Platform 2 | 2 * 22 MW | 11 kV, 50 Hz. | 9 MW | 17.6 MW | Platform 3 | 2 * 22 MW | 11 kV, 50 Hz. | 10 MW | 17 MW | Platform 4 | 2 * 24.8 MW | 11 kV, 50 Hz. | 11 MW | 20 MW | Platform 5 | 24 MW | 11 kV, 50 Hz. | 9 MW | 9 MW* |
| Total | | | 49 MW | 82.6 MW |
|
|
*There is only one gas turbine on platform 5.
|