Research Article

Techno-Economic Feasibility of Small Scale Hydropower in Ethiopia: The Case of the Kulfo River, in Southern Ethiopia

Table 2

World Bank and IEA cost estimate of hydropower [38, 40].

Project cost /kWHead range (m)Remark

Estimate of World Bank group 2012
1800–80002.3–13.5Low head
1000–300027–350High head

Estimate of IEA 2010
2000–7500Small scale hydropower
2500–10000Mini hydropower
1500–2500Low head hydropower