Research Article
Integration of Multiband InSAR and Leveling Measurements for Analyzing the Surface Subsidence of Shield Tunneling at Beijing-Zhangzhou High-Speed Railway
Table 5
Average advance influence angle and advance influence distance parameters of longitudinal section.
|