Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 5 (2000), Issue 5, Pages 421-439
http://dx.doi.org/10.1155/S1024123X99001179

Analysis of a production system with a feedback buffer and a general dispatching time

Department of Industrial Engineering, Sung Kyun Kwan University, Su Won 440-746, Korea

Received 1 December 1998; Revised 13 May 1999

Copyright © 2000 Hindawi Publishing Corporation. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

How to Cite this Article

Ho Woo Lee and Boo Yong Ahn, “Analysis of a production system with a feedback buffer and a general dispatching time,” Mathematical Problems in Engineering, vol. 5, no. 5, pp. 421-439, 2000. doi:10.1155/S1024123X99001179