Mathematical Problems in Engineering
Volume 5 (2000), Issue 6, Pages 479-498
http://dx.doi.org/10.1155/S1024123X99001209
Bottlenecks with respect to due-time performance in pull serial production lines
Department of Electrical Engineering and Computer Sciences, University of Michigan, 1301 Beal Ave., Ann Arbor 48109-2122, MI, USA
Received 10 September 1999
Copyright © 2000 Hindawi Publishing Corporation. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
How to Cite this Article
Jingshan Li and Semyon M. Meerkov, “Bottlenecks with respect to due-time performance in pull serial production lines,” Mathematical Problems in Engineering, vol. 5, no. 6, pp. 479-498, 2000. doi:10.1155/S1024123X99001209