Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 2006, Article ID 27328, 12 pages
http://dx.doi.org/10.1155/MPE/2006/27328

Conservation of filtering in manufacturing systems with unreliable machines and finished goods buffers

1Manufacturing Systems Research Laboratory, GM Research & Development Center, Warren 48090-9055, MI, USA
2Decision Applications Division, Los Alamos National Laboratory, Los Alamos 87545, NM, USA
3Department of Electrical Engineering and Computer Science, University of Michigan, Ann Arbor 48109-2122, MI, USA

Received 22 April 2005; Accepted 22 April 2005

Copyright © 2006 Jingshan Li et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. M. Carrascosa, Variance of the output in a deterministic two-machine line, M.S. thesis, Laboratory for Manufacturing and Productivity, MIT, Massachusetts, 1995.
  2. P. Ciprut, M.-O. Hongler, and Y. Salama, “On the variance of the production output of transfer lines,” IEEE Transactions on Robotics and Automation, vol. 15, no. 1, pp. 33–43, 1999. View at Google Scholar
  3. P. Ciprut, M.-O. Hongler, and Y. Salama, “Fluctuations of the production output of transfer lines,” Journal of Intelligent Manufacturing, vol. 11, no. 2, pp. 183–189, 2000. View at Google Scholar
  4. I. Duenyas and W. J. Hopp, “CONWIP assembly with deterministic processing and random outages,” IIE Transactions, vol. 24, no. 4, pp. 97–109, 1992. View at Google Scholar
  5. S. B. Gershwin, “Variance of output of a tandem production system,” in Queuing Networks with Finite Capacity, R. O. Onvural and I. F. Akyildiz, Eds., Elsevier, 1993. View at Google Scholar
  6. K. B. Hendricks, “The output process of serial production lines of exponential machines with finite buffers,” Operations Research.I, vol. 40, no. 6, pp. 1139–1147, 1992. View at Google Scholar · View at Zentralblatt MATH
  7. D. A. Jacobs and S. M. Meerkov, “System-theoretic analysis of due-time performance in production systems,” Mathematical Problems in Engineering, vol. 1, no. 3, pp. 225–243, 1995. View at Google Scholar · View at Zentralblatt MATH
  8. J. Li, E. Enginarlar, and S. M. Meerkov, “Random demand satisfaction in unreliable production-inventory-customer systems,” Annals of Operations Research, vol. 126, pp. 159–175, 2004. View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet
  9. J. Li and S. M. Meerkov, “Bottlenecks with respect to due-time performance in pull serial production lines,” Mathematical Problems in Engineering, vol. 5, no. 6, pp. 479–498, 2000. View at Google Scholar · View at Zentralblatt MATH
  10. J. Li and S. M. Meerkov, “Production variability in manufacturing systems: Bernoulli reliability case,” Annals of Operations Research, vol. 93, pp. 299–324, 2000. View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet
  11. J. Li and S. M. Meerkov, “Customer demand satisfaction in production systems: a due-time performance approach,” IEEE Transactions on Robotics and Automation, vol. 17, no. 4, pp. 472–482, 2001. View at Google Scholar
  12. J. Li and S. M. Meerkov, “Due-time performance of production systems with Markovian machines,” in Analysis and Modeling of Manufacturing Systems, S. B. Gershwin, Y. Dallery, C. T. Papadopoulos, and J. M. Smith, Eds., pp. 221–253, Kluwer Academic, Massachusetts, 2003. View at Google Scholar · View at Zentralblatt MATH
  13. G. J. Miltenburg, “Variance of the number of units produced on a transfer line with buffer inventories during a period of length T,” Naval Research Logistics., vol. 34, no. 6, pp. 811–822, 1987. View at Google Scholar · View at Zentralblatt MATH
  14. B. Tan, “Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failure,” European Journal of Operational Research, vol. 101, no. 3, pp. 560–576, 1997. View at Google Scholar · View at Zentralblatt MATH
  15. B. Tan, “Effects of variability on the due-time performance of a continuous materials flow production system in series,” International Journal of Production Economics, vol. 54, no. 1, pp. 87–100, 1998. View at Google Scholar
  16. B. Tan, “Variance of the output as a function of time: production line dynamics,” European Journal of Operational Research, vol. 117, no. 3, pp. 470–484, 1999. View at Google Scholar · View at Zentralblatt MATH
  17. B. Tan, “Asymptotic variance rate of the output in production lines with finite buffers,” Annals of Operations Research., vol. 93, pp. 385–403, 2000. View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet