Ant Colony Search Algorithm for Optimal Generators Startup during Power System Restoration

1Department of Electrical Engineering, University of Kashan, Kashan 87317-51167, Iran
2Laboratoire d'Electrotechnique de Grenoble, INPG/ENSIEG, 38402 Saint Martin d'Hères Cedex, France

Received 16 September 2009; Revised 7 December 2009; Accepted 14 January 2010

Academic Editor: Jihuan He

Copyright © 2010 A. Ketabi and R. Feuillet. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. G. Andersson, P. Donalek, R. Farmer et al., “Causes of the 2003 major grid blackouts in North America Europe, and recommended means to improve system dynamic performance,” IEEE Transactions on Power Systems, vol. 20, no. 4, pp. 1922–1928, 2005. View at Publisher · View at Google Scholar · View at Scopus
  2. M. M. Adibi and L. H. Fink, “Power system restoration planning,” IEEE Transactions on Power Systems, vol. 9, no. 1, pp. 22–28, 1994. View at Publisher · View at Google Scholar · View at Scopus
  3. J. J. Ancona, “Framework for power system restoration following a major power failure,” IEEE Transactions on Power Systems, vol. 10, no. 3, pp. 1480–1485, 1995. View at Publisher · View at Google Scholar · View at Scopus
  4. Y. Kojima, S. Warashina, M. Kato, and H. Watanabe, “Application of knowledge engineering techniques to electric power system restoration,” in Proceedings of IEEE Workshop on Artificial Intelligence for Industrial Applications, pp. 320–325, 1988.
  5. M. M. Adibi, T. L. Volkmann, and M. Northern, “Remote cranking of steam electric stations,” IEEE Transactions on Power Systems, vol. 11, no. 3, pp. 1613–1618, 1996. View at Google Scholar · View at Scopus
  6. F. P. de Mello and J. C. Westcott, “Steam plant startup and control in system restoration,” IEEE Transactions on Power Systems, vol. 9, no. 1, pp. 93–101, 1994. View at Publisher · View at Google Scholar · View at Scopus
  7. C.-C. Liu, K.-L. Liou, R. F. Chu, and A. T. Holen, “Generation capability dispatch for bulk power system restoration. A knowledge-based approach,” IEEE Transactions on Power Systems, vol. 8, no. 1, pp. 316–325, 1993. View at Publisher · View at Google Scholar · View at Scopus
  8. T. Nagata, H. Sasaki, and R. Yokoyama, “Power system restoration by joint usage of expert system and mathematical programming approach,” IEEE Transactions on Power Systems, vol. 10, no. 3, pp. 1473–1479, 1995. View at Publisher · View at Google Scholar · View at Scopus
  9. A. Ketabi, H. Asmar, A. M. Ranjbar, and R. Feuillet, “An approach for optimal units start-up during bulk power system restoration,” in Proceedings of the Large Engineering Systems Conference on Power Engineering, pp. 190–194, 2001.
  10. Y. Liu and X. Gu, “Skeleton-network reconfiguration based on topological characteristics of scale-free networks and discrete particle swarm optimization,” IEEE Transactions on Power Systems, vol. 22, no. 3, pp. 1267–1274, 2007. View at Publisher · View at Google Scholar · View at Scopus
  11. British Electricity International, Modern Power Station Practice, vol. C, D, and G, Pergamon Press, Oxford, UK, 1991.
  12. S. L. Tanimoto, The Elements of Artificial Intelligence: An Introduction Using LISP, Computer Science Press, New York, NY, USA, 1987.
  13. M. Dorigo and T. Stützle, Ant Colony Optimization, MIT Press, Cambridge, Mass, USA, 2004.
  14. Y. U. In-Keun, C. S. Chou, and Y. H. Song, “Application of the ant colony search algorithm to short-term generation scheduling problem of thermal units,” in Proceedings of the International Conference on Power System Technology, vol. 1, pp. 552–556, 1998.
  15. M. Y. El-Sharkh, N. S. Sisworahardjo, A. Rahman, and M. S. Alam, “An improved ant colony search algorithm for unit commitment application,” in Proceedings of IEEE Power Systems Conference and Exposition, pp. 1741–1746, 2006.
  16. Y. H. Hou, Y. W. Wu, L. J. Lu, and X. Y. Xiong, “Generalized ant colony optimization for economic dispatch of power systems,” in Proceedings of IEEE International Conference on Power System Technology, vol. 1, pp. 225–229, 2002.
  17. J. G. Vlachogiannis, N. D. Hatziargyriou, and K. Y. Lee, “Ant colony system-based algorithm for constrained load flow problem,” IEEE Transactions on Power Systems, vol. 20, no. 3, pp. 1241–1249, 2005. View at Publisher · View at Google Scholar · View at Scopus