Tab 5
/
Research Article
Change Point Detection with Robust Control Chart
Table 5
Simulation result: estimates of expected length, average change point, standard error, average size of confidence, set and coverage probability for change point of
(slash distribution).
X-Bar chart
Median chart
Proposed MM chart
Magnitude of shift,
Magnitude of shift,
Magnitude of shift,
Expected length,
E(T)
124.00
120.46
114.63
103.00
102.17
101.46
103.00
102.24
101.50
99.40
97.84
92.46
65.40
64.29
64.74
66.00
64.75
64.85
Standard error (
)
37.40
42.48
28.23
14.90
14.78
14.61
14.90
14.81
14.58
Average size, CS
1.01
1.01
1.02
1.08
1.07
1.07
1.07
1.06
1.07
Coverage probability
0.029
0.056
0.083
0.040
0.055
0.076
0.040
0.056
0.079