Research Article

Change Point Detection with Robust Control Chart

Table 6

Precision of the estimator when used with -Bar chart for different magnitudes of process change (magnitude of shift, ) based on 10,000 trials. Subgroup size , change point (normal distribution).

Magnitude of shift,

0.26600.60490.8168
0.47900.83230.9393
0.62300.91390.9734
0.70800.95370.9834
0.76100.97200.9843
0.79900.97830.9893
0.82600.98110.9900
0.85800.98310.9909
0.87900.98480.9909
0.91000.98770.9915
0.92200.98990.9915