Research Article

Change Point Detection with Robust Control Chart

Table 7

Precision of the estimator when used with median chart for different magnitudes of process change (magnitude of shift, ) based on 10,000 trials. Subgroup size , change point (normal distribution).

Magnitude of shift,

0.25200.59590.8164
0.47200.83460.9412
0.61200.91660.9769
0.69600.95570.9870
0.75100.97220.9882
0.79100.97940.9923
0.82000.98220.9930
0.85600.98330.9930
0.87600.98500.9930
0.88800.98790.9930
0.90600.98880.9930