Abstract

This paper investigates the ordering decisions and coordination mechanism for a distributed short-life-cycle supply chain. The objective is to maximize the whole supply chain's expected profit and meanwhile make the supply chain participants achieve a Pareto improvement. We treat lead time as a controllable variable, thus the demand forecast is dependent on lead time: the shorter lead time, the better forecast. Moreover, optimal decision-making models for lead time and order quantity are formulated and compared in the decentralized and centralized cases. Besides, a three-parameter contract is proposed to coordinate the supply chain and alleviate the double margin in the decentralized scenario. In addition, based on the analysis of the models, we develop an algorithmic procedure to find the optimal ordering decisions. Finally, a numerical example is also presented to illustrate the results.

1. Introduction

Along with the development of new technology, increasingly diversified customers’ demand, and higher competition, the lifespan of some products are getting shorter and shorter (so are called short-life-cycle products). Short-life-cycle products, such as toys, sunglasses, high-technology products, and fashion clothing, which are characterized by short sales season, high demand variety, and long replenishment lead time. In addition, for short-life-cycle products, both overstock and understock could result in huge loss, thus reducing demand uncertainty is the main task in managing this kind of supply chain (see Lowson et al. [1]).

In practice, QR (quick response) with forecast updates is a method for reducing demand uncertainty (see, e.g., Tersine and Hummingbird [2], Rohr and Correa [3], and Perry et al. [4]). Its idea is to cut ordering lead time and enable orders from retailers to be placed close to the start of the selling season. Through the postponement, information is gathered to update the demand forecast (see Iyer and Bergen [5]).

Concerning forecast updates, the Bayesian approach is a well-known technique to use new information to revise the demand forecast. The procedure of forecast updates using Bayesian approach is as follows. First, a demand distribution is chosen from a family of distributions whose parameters are partly or both stochastic with given prior distributions. Second, if new information becomes available, Bayesian formula is used to calculate posterior distributions of the parameters. Last, the posterior distributions of the parameters are used to update demand distribution.

When lead time can be shortened by extra investment (when it is controllable), there are two problems in ordering decision making. The first question is when to order and how much to order from the stand point of a buyer. This question involves two tradeoffs: longer versus shorter lead time, more versus less ordering quantity. A shorter lead time leads to lower demand uncertainty, more crashing cost, and vice versa. On the other hand, the more ordering quantity results in less cost of understock, more cost of overstock, and vice versa. The second question is how to motivate the supply chain participants to cooperate and achieve a win-win situation with contract from the stand point of the supply chain. This is because decisions made from the perspective of the whole supply chain may not always make both supply chain participants better off.

Lead time is an important factor that affects the operational cost, service level and forecast uncertainty in a short-life-cycle-product supply chain. However, most of the literatures on short-life-cycle products focused on how much to order (decision on ordering quantity) and neglected the decision on when to order (decision on lead time). Because of the complexity of the decision based on both the lead time and ordering quantity, the optimal ordering policy for short-life-cycle products with controllable lead time has not been fully studied.

The purpose of this paper is to take lead time decision making into account in a distribution supply chain, which consists of one retailer and one manufacturer. The supply chain operates a single short-life-cycle product. Optimal ordering policies with lead time decision in two scenarios are considered. In the decentralized decision-making scenario, the retailer makes decisions on lead time and ordering quantity to maximize his own profit. In the centralized decision scenario, decisions on lead time and ordering quantity are made to maximize the whole supply chain’s profit. In addition, a supply chain contract is developed to coordinate the supply chain, and the conditions that the supply chain contract works are investigated.

The remainder of the paper is organized as follows. Section 2 briefly reviews the related literatures. Section 3 gives some notations and basic assumptions of the research topic. Then, in Section 4, a decentralized decision-making model to maximize the retailer’s profit and a centralized decision-making model to maximize the system-wide supply chain’s profit are formulated. Furthermore, we discuss the existence and attributes of the optimal solutions, and efficient algorithms to search the optimal solutions are developed. In Section 5, a three-parameter supply contract is proposed, and the conditions needed for successful coordination are investigated. The numerical analysis is carried out in Section 6. The paper is concluded in Section 7.

2. The Literature Review

There are three categories of literature related to our research. The first is on QR policy with forecast updates, the second is on inventory management with controllable lead time, and the third is on supply coordination with contracts. We briefly review them, respectively.

2.1. The Literatures on QR with Forecast Updates

This kind of the literature utilizes the Bayesian theorem to update forecast for short-life-cycle products, which is the same as our work. However, the literature focuses on the concept of lead time reduction other than decision on lead time. In addition, the cost of lead time reduction and the relationship between lead time and forecast error have not been clearly considered. In this section, we review some of the works especially related to our study.

Among them, Iyer and Bergen [5] investigate the effects of QR on supply chain participants. They observe that cutting lead time is always beneficial to the retailer while harmful to the vendor when the service level is more than 0.5. However, only ordering quantity decision is involved in their works, and there is no tradeoff between the benefits and the cost of lead time reduction in their model. Otherwise, if the cost of lead time reduction is considered, their conclusion will change.

Wu [6] extends Iyer and Bergen’s [5] forecast updates mode from a single stage to multiple stages and proposes a flexible contract to coordinate the supply chain. Similarly, lead time decision is not included in Wu’s [6] work. From the numerical examples in [6], it is shown that more stages of forecast updates leads to more profits of the whole supply chain participants. It is obvious that this is not the truth if the cost of forecast updates or the cost of lead time reduction is considered.

Similarly, without concerning crashing cost, Choi [7] extend Iyer and Bergen’s [5] work to a scenario that new information can be used to update both the unknown mean and unknown variance for the short-life-cycle product’s demand. Choi [7] conclude that the QR policy is always beneficial to the retailer and not necessarily beneficial to the supplier when the service level is more than 0.5 (this conclusion is similar to that of Iyer and Bergen [5]). Here, we can say that if the cost of lead time reduction is considered, we can get a different conclusion. Further, Choi et al. [8] takes dual updates and costs uncertainty and differences into account in his work, but there is no explicit relationship between the forecast error and lead time. Meanwhile, lead time decision is not taken into account in their models.

Fisher and Raman [9], Gurnani and Tang [10], Donohue [11], Sethi et al. [12], Choi and Li [13], Choi [14], Chen et al. [15], and Chen et al. [16] study the optimal ordering policy with two ordering opportunities. The unit cost at the second stage may be higher than that at the first stage (see, Fisher and Raman [9], Donohue [11]) or may be uncertain (see, Gurnani and Tang [10], Sethi et al. [12], Choi and Li [13], Choi [14]Chen et al. [15]). In these works, the retailer makes decisions on the two sequent ordering quantities by evaluating the trade-off between a more accurate forecast and a potentially higher unit cost at the second stage. There is no explicit relationship between the forecast error and lead time. Meanwhile, lead time decision is not taken into account in their models.

Similarly, Sethi et al. [1719] extend ordering policy from two periods to multiple periods. In each period, decisions on how much to order using some given delivery modes are made. However, lead time decisions and the relationship between lead time and forecast error are not involved in their works.

The research of the paper is very similar to that of Choi et al. [20], which investigates a retailer’s optimal single ordering policy with multiple delivery modes. But our model differs from theirs in two major aspects. Firstly, in our paper, lead time is a decision variable. Both the forecast error of expected demand and the crashing cost are functions of the lead time. The decision making on lead time is to make tradeoff between the crashing cost and benefits of forecast improvement. However, lead time decision isn’t involved in their model. Secondly, a three-parameter risk-sharing supply contract is proposed to coordinate the decentralized supply chain, and the conditions of channel coordination are derived in our paper, while their work is only related to the optimal ordering decision from the standpoint of the retailer.

This research explicitly takes the relationship between lead time and the forecast error, the relationship between lead time and crashing cost, into account, simultaneously addressing the two problems mentioned in Section 1 in a distribution supply chain.

2.2. The Literatures on Variable or Controllable Lead Time

The literature falling into this category mainly focus on ordering quantity, lead time, service level, and so forth. The treatment of lead time as a deterministic decision variable within inventory models began with Liao and Shyu [21]. They introduced the concept of crashing cost to stochastic inventory models, in which lead time can be decomposed into 𝑛 components, and each has an independent crashing cost for reduced lead time. Sequentially, many researchers have developed various analytical inventory models to extend Liao and Shyu’s [21] model (see, e.g., Ben-Daya and Raouf [22], Ben-Daya and Hariga [23], Ouyang et al. [2427], Moon and Choi [28], Moon and Cha [29], Hariga and Ben-Daya [30], Hariga [31], Pan and Yang [32], C. Chang and S. Chang [33], Chang et al. [34, 35], Chu et al. [36], Lee et al. [37], Lin [38], Wu et al. [39], and Jha and Shankera [40]).

This paper is similar to the above-mentioned literatures with the concept that lead time is a decision variable and can be reduced at an added crashing cost. However, there are three differences between this paper and the above-mentioned studies. Firstly, the above-mentioned studies dealt with multiperiod inventory problems for durable goods; this paper dealt with single-period ordering problem for short-life-cycle products, whose demands have high uncertainty. Secondly, neither the relationship between lead time and the forecast error nor forecast updates are taken into account in the above-mentioned studies. Thirdly, the above-mentioned literature investigated an optimal decision from a stand point of the single supply chain participant or from a standpoint of the whole supply chain, and the coordination was not considered.

2.3. The Literatures on Supply Chain Coordination with Contract

Due to the conflicts of interests and the distributed nature of the decision structure in supply chain, there exists double marginalization (Spengler [41]) that may lead to low efficiency in supply chain. Among various kinds of supply chain coordination, the coordination by contract received much attention. Hennet and Arda [42] evaluate the efficiency of different types of contracts between the industrial partners of a supply chain. Cachon [43] makes a comprehensive review of supply chain contracts. In the literature, various contracts are developed to coordinate the supply chain, such as buyback contract (Padmanabhan and Png [44]), quantity flexibility contract (Tsay [45]), revenue-sharing contract (Cachon and Lariviere [46]), and wholesale price only contract (Lariviere and Porteus [47]).

Each kind of contract has its limitations and strengths as Arshinder et al. [48] point out that the study of supply chain coordination is still in its infancy, and a little effort has been reported in the literature to develop a holistic view of coordination.

In fact, to develop a contract needs to orient the specific problem and the potential risk. In our work, the retailer’s decisions on lead time and ordering quantity can bring crashing cost, overstock loss, or understock loss. Neither single contract above mentioned can coordinate the two risks. Therefore, we develop a three-parameter supply contract to coordinate these risks simultaneously. Further, the contract can flexibly allocate the profit of the supply chain according to the participants’ value-added capabilities, and it is easy for practitioners to adopt in practice.

3. Notations and Assumptions

We will begin the modeling process by presenting the following notations and assumptions.

3.1. Notations

The notations employed in the paper are as follows:𝑝: unit retail price of the retailer, 𝑣: unit residual value of the unsold product of the retailer,𝑐: unit product cost of the manufacturer,𝑛: numbers of mutually independent lead-time components,𝑜𝑗: crashing cost when one unit time is shorten for the 𝑗th (1𝑗𝑛) lead-time component,𝑎𝑗: minimum time of the 𝑗th (1𝑗𝑛) lead-time component,𝑏𝑗: regular time for the 𝑗th (1𝑗𝑛) lead-time component,𝑤0: unit wholesale price which the manufacturer provided to the retailer, 𝑝>𝑤0>𝑐>𝑣,𝑞: ordering quantity from the retailer (decision variable for the retailer),𝑡 lead time (decision variable for the retailer); it is the time from the retailer placing an order to receiving goods and using this goods to meet the end consumers’ demand. It can be changed by adding an extra investment. The longest lead time is𝑇𝑛, and the shortest is𝑇0,𝑋: market demand; it is a stochastic variable, mean of 𝑋 is also a stochastic variable,𝑓𝑋(): probability distribution function (pdf) of the stochastic variable𝑋,𝑓𝑋𝑌(): conditional pdf of the stochastic variable𝑋given𝑌,Φ(): cumulative distribution function (cdf) of standard normal distribution,𝜑(): pdf of standard normal distribution,𝑋+: maximum value of 𝑋 and 0, that is;𝑋+=max{𝑋,0},𝐸(): mathematical expectation of a stochastic variable.

3.2. Assumptions

The assumptions employed in this paper are stated as follows.

(1) Assumption about the Supply Chain and Its Participants
A single-buyer-single-vendor supply chain that manufactures and sells a single short-life-cycle product. The retailer and the manufacturer are both risk neutral. Viewing the wholesale price as a given parameter, the retailer makes decisions on when to order and how many to order. This paper assumes that the retailer only has one ordering opportunity in the entire selling season, which is based on long replenishment lead time and other situations (see, Choi et al. [20]).

(2) Assumption about the Lead Time
For the sake of simplicity, we assume that the selling season begins at time zero, see Figure 1. Therefore, “𝑡” refers to 𝑡 time units ahead. The minimum time of the 𝑗th (1𝑗𝑛) component of lead time is𝑎𝑗; regular time is𝑏𝑗; crashing cost per unit time is𝑜𝑗.
To facilitate our discussion, 𝑛 mutually independent components of lead time are realigned according to the unit crash costs in a descending order, denoted by𝑜1𝑜2𝑜𝑛. The component of the smallest per unit crashing costs should be prioritized when lead time is reduced; the rest may be deduced by analogy.
The maximum lead time, all whose components are equal to regular time, is denoted by 𝑇𝑛=𝑛𝑗=1𝑏𝑗.(3.1)
The minimum lead time, all whose components are equal to the minimum time, is denoted by 𝑇0=𝑛𝑗=1𝑎𝑗.(3.2)
If the components from 1 to𝑖all have the regular lead time, the others (from 𝑖+1 to 𝑛) have a minimum time, then the lead time is 𝑇𝑖=𝑛𝑗=𝑖+1𝑎𝑗+𝑖𝑗=1𝑏𝑗,𝑖=1,2,,𝑛.(3.3)
It is easy to know that 𝑇𝑖=𝑛𝑗=1𝑏𝑗𝑛𝑗=𝑖+1𝑏𝑗𝑎𝑗,𝑖=1,2,,𝑛.(3.4)
Given lead time 𝑡(𝑇0𝑡𝑇𝑛), the total crashing cost is 𝑜𝑅(𝑡)=1𝑇1+𝑡𝑛𝑗=2𝑜𝑗𝑏𝑗𝑎𝑗,𝑇0𝑡<𝑇1𝑜2𝑇2+𝑡𝑛𝑗=3𝑜𝑗𝑏𝑗𝑎𝑗,𝑇1𝑡<𝑇2𝑜𝑖𝑇𝑖+𝑡𝑛𝑗=𝑖+1𝑜𝑗𝑏𝑗𝑎𝑗,𝑇𝑖1𝑡<𝑇𝑖𝑜𝑛𝑇𝑛1𝑡,𝑇𝑛1𝑡𝑇𝑛.(3.5)

(3) Assumption about the Information Updates
In this paper, we extend the demand uncertainty structure in Iyer and Bergen [5]. Demand uncertainty has two levels, and it is related to lead time𝑡. The first source of uncertainty concerns the expected demand during the selling season;Θ is a stochastic variable and has pdf:𝑓Θ(𝜃)𝑁(𝜇,𝜏2). This is called the prior pdf of the expected demand. Given the value of the expected demand,Θ=𝜃, the demand for product during the selling season is also a stochastic variable, and the forecast error is denoted by𝑠(𝑡). The demand 𝑋 during the selling season has pdf:𝑓𝑋Θ(𝑥𝜃)𝑁(𝜃,𝑠2(𝑡)). Thus, the pdf for 𝑋 is 𝑓𝑋(𝑥)=𝜃𝑓𝑋𝜃(𝑥𝜃)𝑓𝜃(𝜃)𝑑𝜃𝑁𝜇,𝑠2(𝑡)+𝜏2.(3.6)
In the traditional system, the order is placed at time𝑇𝑛, and there are no information updates. Thus, at the time 𝑇𝑛, the pdf for demand 𝑋 is 𝜃𝑓𝑋𝜃(𝑥𝜃)𝑓𝜃(𝜃)𝑑𝜃𝑁𝜇,𝑠2𝑇0+𝜏2.(3.7)
In a QR system, an order is placed at time𝑡, the demand information of related or similar products is observed, and the information is converted into a value, denoted by 𝑥𝑒, for the demand for the concerned product. This 𝑥𝑒 can be used to generate a posterior distribution for expected demand. Utilizing Bayesian theorem to revise the forecast, we can get that 𝑓Θ𝜃𝑥𝑒=𝑓𝑋Θ𝑥𝑒𝑓𝜃Θ(𝜃)Θ𝑓𝑋Θ(𝑥𝑒𝜃)𝑓Θ𝑠(𝜃)𝑑𝜃𝑁2(𝑡)𝜇+𝜏2𝑥𝑒𝑠2(𝑡)+𝜏2,1𝑠2+1(𝑡)𝜏21.(3.8)
Thus, the pdf for 𝑋 can be further updated as follows: 𝑓𝑋𝑥𝑥𝑒=Θ𝑓𝑋Θ(𝑥𝜃)𝑓Θ𝜃𝑥𝑒𝑠𝑑𝜃𝑁2(𝑡)𝜇+𝜏2𝑥𝑒𝑠2(𝑡)+𝜏2,𝑠21(𝑡)+𝑠2+1(𝑡)𝜏21.(3.9)
This update can be shown in Figure 1.

(4) Assumption about the Forecast Error of the Expected Demand
The essential benefit from QR for fashion products is that the information gathered regarding the sales of related items can be used to reduce forecast error of the expected demand. The magnitude of this reduction in forecast error can be substantial (see, Iyer and Burger [5]). As pointed out by Blackburn [49], there is a fundamental principle of forecasting: the shorter the lead time, the better the forecast. According to Lowson et al. [1] and Blackburn [49], in fashion or seasonal apparel industrial, if lead time is cut down from 12 months to 6 months, the forecast error decreases from ±40 percent to ±19 percent. In addition, the forecast error grows more than linearly as the time to forecast increase, forming a familiar shape known to forecasters as “trumpet of doom.” It can be seen from Figure 2 that there is a direct relationship between lead time (i.e., time ahead of a sales season) and demand forecast error. If the order decision is made at the start of the season, that is, the lead time approaches zero, the forecast error decreases down to ±10 percent.
Let 𝑠 and 𝑡 denote the forecast error of the expected demand and lead time, respectively. We can fit the given observation data in Figure 2 to get the relationship between 𝑠 and𝑡. In Appendix 7, it is shown that the nonlinear relationship between𝑠 and𝑡 can be written as 𝑠=𝛼𝑒𝛽𝑡.(3.10)
Here, parameters 𝛼(>0)and 𝛽(>0) may be estimated using the given data.

4. Mathematical Models, Analysis, and Algorithms

In this section, a decentralized decision-making scenario to maximize the retailer’s profit and an integrated decision-making scenario to maximize the system-wide supply chain’s profit are formulated. Furthermore, we discuss the existence and attributes of the optimal solutions to the above-mentioned models and develop the efficient algorithms to find the optimal solutions.

4.1. Mathematical Models

Under the assumptions in Section 3, if the retailer places his order at time𝑡(𝑇0𝑡𝑇𝑛), the pdf of demand forecasted can be written as (3.9). Once given the demand distribution at time𝑡(𝑇0𝑡𝑇𝑛), we can formulate the profits of the retailer, the manufacturer, and the whole supply chain.

If the market demand and ordering quantity are 𝑋 and 𝑞, respectively, we can get that the sales of the retailer will bemin(𝑞,𝑋). Accordingly, the sales income will be 𝑝min(𝑞,𝑋) in the entire selling season. The unsold for the retailer after the selling season will be(𝑞𝑋)+, and the residual value of unsold goods is𝑣(𝑞𝑋)+. Thus, given lead time𝑡(𝑇0𝑡𝑇𝑛), the expected profit of the retailer isΠ𝑟(𝑞,𝑡)=𝑥𝑒𝑝𝐸min𝑞,𝑋𝑥𝑒+𝑣𝐸𝑞𝑋𝑥𝑒+𝑤0𝑓𝑞𝑅(𝑡)𝑥𝑒𝑥𝑒𝑑x𝑒.(4.1)

Simplifying (4.1) by the integral operation, we can get the expected profit of the supply chain participants as follows.

The expected profit of the retailer isΠ𝑟(𝑞,𝑡)=𝑝𝐸(min(𝑞,𝑋))+𝑣𝐸(𝑞𝑋)+𝑤0𝑞𝑅(𝑡).(4.2)

The expected profit of the manufacturer isΠ𝑚=𝑤0𝑐𝑞.(4.3)

The expected profit of the whole supply chain is Π𝑙(𝑞,𝑡)=Π𝑟(𝑞,𝑡)+Π𝑚=𝑝𝐸(min(𝑞,𝑋))+𝑣𝐸(𝑞𝑋)+𝑐𝑞𝑅(𝑡),(4.4) where𝑞,𝑡satisfies the constraints that𝑞>0,𝑇0𝑡𝑇𝑛.(4.5)

Thus, the decision-making model from the view of the retailer is as follows.

Model (I):max𝑞,𝑡Π𝑟(𝑞,𝑡)=𝑝𝐸(min(𝑞,𝑋))+𝑣𝐸(𝑞𝑋)+𝑤0𝑞𝑅(𝑡).s.t.𝑞>0,𝑇0𝑡𝑇𝑛.(4.6)

The optimal solution of Model (I) is denoted by (𝑞𝐷,𝑡𝐷).

In order to illustrate the effects of different decision-making scenarios on the profits of the supply chain participants and the whole supply chain, we assume that there would exist a virtual center whose decision objective is to maximize the profit of the whole supply chain channel. We call this situation as a centralized decision-making scenario and denote it as model (II).

Model (II): max𝑞,𝑡Π𝑙(𝑞,𝑡)=𝑝𝐸(min(𝑞,𝑋))+𝑣𝐸(𝑞𝑋)+𝑐𝑞𝑅(𝑡),s.t.𝑞>0,𝑇0𝑡𝑇𝑛.(4.7)

The optimal solution to the model (II) is written as (𝑞𝐼,𝑡𝐼).

4.2. Model Analysis

In order to solve the model (I) and model (II), some analysis needs to be done firstly. Since the two models are similar, we only analyze model (I). As far as model (II) is concerned, it may be deduced by analogy. For Model (I), we have the following conclusions.

Theorem 4.1. Denote the standard variance of demand after updates as𝜎(𝑡), then both 𝜎(𝑡) and 𝑑𝜎(𝑡)/𝑑𝑡 are increasing functions of lead time 𝑡.

Proof. For the sake of simplicity, 𝜎(𝑡) and 𝑠(𝑡) are denoted by 𝜎and𝑠, respectively. According to (3.9), the variance of demand after updates at a given lead time𝑡(𝑇0𝑡𝑇𝑛) can be expressed as 𝜎2=𝑠2+𝑠2𝜏2𝑠2+𝜏2.(4.8) For the sake of simplicity, denote 𝜏𝑢=2𝑠2+𝜏2.(4.9) It is obvious that0<𝑢<1.
Substituting (4.9) into (4.8), we can get 𝜎2=𝑠2(1+𝑢).(4.10) Taking the first derivative of 𝑢 with respect to𝑡 and simplifying it through (3.10), we can obtain 𝑑𝑢𝑑𝑡=2𝛽𝑢(1𝑢).(4.11) Taking the first derivative of 𝜎2 with respect to𝑡 and simplifying it through (4.9), we can obtain 𝑑𝜎=𝑑𝑡𝛽𝑠2𝜎1+𝑢2>0.(4.12) Taking the second derivative of 𝜎 with respect to𝑡 and simplifying it through (4.9), we can obtain 𝑑2𝜎𝑑𝑡2=𝛽2𝑠4𝜎31+2𝑢4𝑢2+2𝑢3+3𝑢4.(4.13) Simplifying (4.13) by factorization technique, we can get 𝑑2𝜎𝑑𝑡2=𝛽2𝑠4𝜎31+2𝑢(1𝑢)2+3𝑢4)>0.(4.14) It is clearly seen that both 𝜎(𝑡) and 𝑑𝜎(𝑡)/𝑑𝑡 are increasing functions of lead time 𝑡 from (4.12) and (4.14).

Theorem 4.2. For fixed 𝑡, Π𝑟(𝑞,𝑡) is a strictly concave function of 𝑞, and its maximal value occurs at 𝑞=𝜇+𝜎Φ1(𝑝𝑤0)/(𝑝𝑣). For𝑞=𝜇+𝜎Φ1(𝑝𝑤0)/(𝑝𝑣),𝑑/𝑑𝑡(Π𝑟(𝑞,𝑡)𝑞=𝜇+𝜎Φ1(𝑝𝑤0)/(𝑝𝑣)) is a strictly decreasing function of 𝑡.

Proof. Two identical equations used are presented as follows. min(𝑞,𝑋)=𝑋(𝑋𝑞)+,(𝑞𝑋)+=(𝑞𝑋)+(𝑋𝑞)+.(4.15) Insert (4.15) into (4.2), we can get Π𝑟(𝑞,𝑡)=𝑝𝐸𝑋(𝑋𝑞)++𝑣𝐸(𝑞𝑋)+(𝑋𝑞)+𝑤0𝑞𝑅(𝑡).(4.16) Further, 𝐸𝑋(𝑋𝑞)+=𝐸(𝑋)𝐸(𝑋𝑞)+=𝜇𝐸(𝑋𝑞)+,𝐸(𝑞𝑋)+(𝑋𝑞)+=𝑞𝐸(𝑋)+𝐸(𝑋𝑞)+=𝑞𝜇+𝐸(𝑋𝑞)+.(4.17) Insert (4.17) into (4.2), we can get Π𝑟𝑤(𝑞,𝑡)=(𝑝𝑣)𝜇0𝑣𝑞(𝑝𝑣)𝐸(𝑋𝑞)+.(4.18) Further, by integral operation, we can get 𝐸(𝑋𝑞)+=𝑞𝜑(𝑥𝑞)𝑓(𝑥)d𝑥=𝜎𝑞𝜇𝜎𝑞𝜇𝜎1Φ𝑞𝜇𝜎.(4.19) Insert (4.19) into (4.18), and, by some algebraic operation, we can get Π𝑟(𝑞,𝑡)=𝑝𝑤0𝑞(𝑝𝑣)(𝑞𝜇)Φ𝑞𝜇𝜎+𝜎𝜑𝑞𝜇𝜎𝑅(𝑡).(4.20) Taking the first partial derivatives of Π𝑟(𝑞,𝑡) with respect to 𝑞 and 𝑡; respectively, via (4.20), we can obtain 𝜕Π𝑟(𝑞,𝑡)=𝜕𝑞𝑝𝑤0(𝑝𝑣)Φ𝑞𝜇𝜎,(4.21)𝜕Π𝑟(𝑞,𝑡)𝜕𝑡=(𝑝𝑣)𝜑𝑞𝜇𝜎𝜕𝜎𝜕𝑡𝜕𝑅.𝜕𝑡(4.22)
Taking the second partial derivative of Π𝑟(𝑞,𝑡) with respect to 𝑞 and 𝑡, we can obtain 𝜕2Π𝑟(𝑞,𝑡)𝜕𝑞2=(𝑝𝑣)𝜑𝑞𝜇𝜎<0.(4.23)
Setting the RHS of (4.21) to zero, we can get 𝑞=𝜇+𝜎Φ1𝑝𝑤0𝑝𝑣.(4.24)
It is clearly seen from (4.23) that, for fixed 𝑡,Π𝑟(𝑞,𝑡) is a strictly concave function of𝑞. Therefore, for fixed𝑡, the maximal value of Π𝑟(𝑞,𝑡)occurs at𝑞=𝜇+𝜎Φ1(𝑝𝑤0)/(𝑝𝑣). Given 𝑝,𝑤0, 𝑣, Φ1(𝑝𝑤0)/(𝑝𝑣) is a constant.
Denote 𝑘=Φ1(𝑝𝑤0)/(𝑝𝑣), then (4.24) can be written as follows: 𝑞=𝜇+𝑘𝜎.(4.25) Substituting (4.25) into (4.22), we can get 𝑑Π𝑑𝑡𝑟(𝑞,𝑡)𝑞=𝜇+𝑘𝜎)=(𝑝𝑣)𝜑(𝑘)𝑑𝜎𝑑𝑡𝑑𝑅𝑑𝑡.(4.26)
From (4.23), we can see that there is no variable 𝑞 in the expression of𝑑/𝑑𝑡(Π𝑟(𝑞,𝑡)𝑞=𝜇+𝑘𝜎)). For convenience, we denote𝑔(𝑡)=𝑑/𝑑𝑡(Π𝑟(𝑞,𝑡)𝑞=𝜇+𝑘𝜎)).
Taking the partial derivative of 𝑔(𝑡) with respect to 𝑡 through (4.26), we can obtain 𝑑𝑔(𝑡)𝑑𝑑𝑡=(𝑝𝑣)𝜑(𝑘)2𝜎𝑑𝑡2.(4.27) According to Theorem 4.1, it is easy to know that 𝑑𝑔(𝑡)/𝑑𝑡<0. Therefore,𝑔(𝑡) is a strictly decreasing function of 𝑡.

Theorem 4.3. The optimal solution to model (I) is in existence and unique.

Proof. For fixed 𝑞 in (4.21), take the partial derivative of 𝜕Π𝑟(𝑞,𝑡)/𝜕𝑞; with respect to𝑡, we can obtain 𝜕2Π𝑟(𝑞,𝑡)=𝜕𝑞𝜕𝑡𝑝𝑣𝜎𝑞𝜇𝜎𝜑𝑞𝜇𝜎𝜕𝜎𝜕𝑡.(4.28)
Therefore, the Hessian Matrix of Π𝑟(𝑞,𝑡)is as follows. 𝐻=(𝑝𝑣)𝜑𝑞𝜇𝜎𝑝𝑣𝜎𝑞𝜇𝜎𝜑𝑞𝜇𝜎𝜕𝜎𝜕𝑡𝑝𝑣𝜎𝑞𝜇𝜎𝜑𝑞𝜇𝜎𝜕𝜎𝜕𝑡(𝑝𝑣)𝜑𝑞𝜇𝜎(𝑞𝜇)2𝜎3𝜕𝜎𝜕𝑡2+𝜕2𝜎𝜕𝑡2.(4.29)
Then, we proceed by evaluating the principal minor determinants of 𝐻.
The first-order principal minor determinant of 𝐻 is 𝐻11=(𝑝𝑣)𝜑𝑞𝜇𝜎<0.(4.30)
The second-order principal minor determinant of 𝐻 is 𝐻22=|||||||(𝑝𝑣)𝜑𝑞𝜇𝜎𝑝𝑣𝜎𝑞𝜇𝜎𝜑𝑞𝜇𝜎𝜕𝜎𝜕𝑡𝑝𝑣𝜎𝑞𝜇𝜎𝜑𝑞𝜇𝜎𝜕𝜎𝜕𝑡(𝑝𝑣)𝜑𝑞𝜇𝜎(𝑞𝜇)2𝜎3𝜕𝜎𝜕𝑡2+𝜕2𝜎𝜕𝑡2|||||||=(𝑝𝑣)2𝜎𝜑2𝑞𝜇𝜎𝜕2𝜎𝜕𝑡2>0.(4.31)
Thus, 𝐻 is a negative definite matrix. It is clearly seen that Π𝑟(𝑞,𝑡)is a strictly concave function of 𝑞and𝑡. Thus, the maximum value of Π𝑟(𝑞,𝑡)is in existence and unique.
Since Model (I) is similar to Model (II), we analyze the Model (I) only. From Theorem 4.2, if (𝑞𝐷,𝑡𝐷) is the optimal solution to Model (I), then the condition, 𝑞𝐷=𝜇+𝜎(𝑡𝐷)Φ1(𝑝𝑤0)/(𝑝𝑣), must be satisfied. Therefore, how to get the optimal 𝑡𝐷 to the Model (I) is a key step in solving the Model (I). For Model (I), we have the following conclusion.

Theorem 4.4. The optimal 𝑡𝐷 to the Model (I) is the only one of the following four cases.

The optimal 𝑡𝐷 to the Model (I) is the only one of the following four cases.

Case 1. 𝑡𝐷is𝑇0.

Case 2. 𝑡𝐷 is 𝑇𝑛.

Case 3. 𝑡𝐷 is the only one of the 𝑇1,𝑇2,,𝑇𝑛1.

Case 4. 𝑡𝐷 is the only one solution to the equation 𝑔(𝑡)=0 in a certain interval (𝑇𝑖1,𝑇𝑖),2𝑖𝑛1.

Proof. If𝑔(𝑡)𝑡=𝑇00, then, from Theorem 4.2, we can get that, for 𝑡[𝑇0,𝑇𝑛], 𝑔(𝑡)0. In this case, the optimal 𝑡𝐷 to the Model (I) is𝑇0, and this is Case 1.
If 𝑔(𝑡)𝑡=𝑇𝑛0, then, from Theorem 4.2, we can get that for 𝑡[𝑇0,𝑇𝑛], 𝑔(𝑡)0. In this case, the optimal 𝑡𝐷 to the Model (I) is𝑇𝑛, and this is the Case 2.
Since 𝑅(𝑡)is defined in the interval [𝑇𝑖1,𝑇𝑖),𝑖=1,2,,𝑛1, and 𝑔(𝑡) is a continuous function of 𝑡 in the interval [𝑇𝑖1,𝑇𝑖),𝑖=1,2,,𝑛, but not a continuous function of 𝑡 in the interval [𝑇0,𝑇𝑛], we denote 𝑔(𝑡)𝑡=𝑇𝑖=lim𝑡𝑇𝑖𝑔(𝑡),𝑖=1,2,𝑛1. Then from Theorem 4.2, it is easy to know that 𝑔(𝑡)𝑡=𝑇𝑖>𝑔(𝑡)𝑡=𝑇𝑖.
If 𝑔(𝑡)𝑡=𝑇𝑛<0and𝑔(𝑡)𝑡=𝑇0>0, then from the Theorem 4.2, we know that there will exist a unique 𝑖(1𝑖𝑛), which satisfies that 𝑔(𝑡)𝑡=𝑇𝑖0,𝑔(𝑡)𝑡=𝑇𝑖0(4.32) or 𝑔(𝑡)𝑡=𝑇𝑖1>0,𝑔(𝑡)𝑡=𝑇𝑖<0.(4.33)
If 𝑔(𝑡)𝑡=𝑇𝑛<0 and 𝑔(𝑡)𝑡=𝑇0>0 and condition (4.32) is met, then from Theorem 4.2 we know that, for 𝑡[𝑇0,𝑇𝑖), 𝑔(𝑡)>0 and, for 𝑡[𝑇𝑖,𝑇𝑛], 𝑔(𝑡)0. Hence, the optimal 𝑡𝐷 to the Model (I) is𝑇𝑖, and this is Case 3.
If 𝑔(𝑡)𝑡=𝑇𝑛<0and𝑔(𝑡)𝑡=𝑇0>0 and condition (4.33) is met, then from Theorem 4.2 we know that there exists a unique solution (denoted by𝑡𝐷) to equation𝑔(𝑡)=0. From Theorem 4.2, we know that, for 𝑡[𝑇0,𝑡𝐷), 𝑔(𝑡)>0 and for 𝑡(𝑡𝐷,𝑇𝑛], 𝑔(𝑡)<0. Hence, the optimal 𝑡 value of the Model (I) is𝑡𝐷, and this is Case 4.

4.3. Algorithms

According to Theorem 4.4, we develop an algorithm for solving model (I). As far as model (II) is concerned, it may be deduced by analogy.

Step 1. Compute the values of 𝑔(𝑡)𝑡=𝑇0 and 𝑔(𝑡)𝑡=𝑇𝑛, and compare them with zero, respectively. Go to Step 2.

Step 2. If 𝑔(𝑡)𝑡=𝑇00, then this is Case 1 in Theorem 4.4. Therefore, the optimal 𝑡𝐷is 𝑇0. Turn to Step 5.
If 𝑔(𝑡)𝑡=𝑇𝑛0, then this is Case 2 in the Theorem 4.4. Therefore, the optimal 𝑡𝐷is 𝑇𝑛. Turn to Step 5.
If 𝑔(𝑡)𝑡=𝑇𝑛<0and𝑔(𝑡)𝑡=𝑇0>0, then turn to Step 3.

Step 3. For 𝑖(1𝑖𝑛1), check the signals of 𝑔(𝑡)𝑡=𝑇𝑖 and 𝑔(𝑡)𝑡=𝑇𝑖 one by one. For certain𝑖, if a non-positive number first appears between them, stop the check.
If a non-positive number occurs at 𝑔(𝑡)𝑡=𝑇𝑖 firstly, this is Case 3, and the optimal 𝑡𝐷is 𝑇𝑖. Go to Step 5.
If a non-positive number occurs at 𝑔(𝑡)𝑡=𝑇𝑖 firstly, this is Case 4, turn to Step 4.

Step 4. A Golden section method or two-section method can be used to search the optimal solution to the equation 𝑔(𝑡)=0 in the interval (𝑇𝑖1,𝑇𝑖). Let 𝑡𝐷denote the optimal solution, go to Step 5.

Step 5. Compute the optimal 𝑞𝐷 to model (I) through (4.24), and end the algorithm.
The algorithm for solving model (II) is similar to that of the model (I) as mentioned above, so we skip it here.

5. Supply Chain Coordination

In a distributed supply chain, since the supply chain participants are independent entities; thus, decisions are made to maximize the decision maker’s own profit. To some extent, the double marginalization (e.g., Spengler [41]) will take place, and this will cut down the profit of the whole supply chain. In order to improve supply chain efficiency, the supply chain participants can collaborate through a contract to get a win-win situation. The contract aligns the two self-interested parties, so their decentralized actions maximize the whole supply chain (Chen et al. [15]).

In apparel industries, the manufacturer usually uses buy-back contract to enable retailers to enlarge ordering quantity (such as Padmanabhan and Png [44]). In addition, since the crashing cost is existence, there is inconsistency for the optimal decision on the lead time from the retailer with that from the supply chain system. Hence, the manufacturer should share some of the crashing costs in order to motivate the retailer to obey the optimal decision on lead time from the supply chain channel.

In order to coordinate the supply chain, a three-parameter contract which combines buy-back and risk-sharing contract is developed in this paper.

Let (𝑏,𝑤,𝜆) denote the three-parameter contract. Under such a contract, the manufacturer sells products at unit price of 𝑤 to the retailer at the start of the season and agrees to purchase 𝑏 ratio of left over units at the end of the selling season. 1𝑏 ratio of left over units at the end of the selling season is salvaged by the retailer. Furthermore, 𝜆 ratio of crashing cost is charged on the retailer, and 1𝜆 ratio of crashing cost is charged on the manufacturer.

In this scenario, the expected profit of the retailer isΠ𝐶𝑟(𝑞,𝑡)=𝑝𝐸(min(𝑞,𝑥))+(1𝑏)𝑣𝐸(𝑞𝑥)++𝑏𝑤𝐸(𝑞𝑥)+𝑤𝑞𝜆𝑅(𝑡).(5.1)

The expected profit of the manufacturer isΠ𝐶𝑚=(𝑤𝑐)𝑞+𝑏(𝑣𝑤)𝐸(𝑞𝑥)+(1𝜆)𝑅(𝑡).(5.2)

The expected profit of the whole supply chain is Π𝐶𝑙(𝑞,𝑡)=Π𝑙(𝑞,𝑡)=𝑝𝐸(min(𝑞,𝑥))+𝑣𝐸(𝑞𝑥)+𝑐𝑞𝑅(𝑡)(5.3) where 𝑞,𝑡satisfies the constrains that 𝑞>0,𝑇0𝑡𝑇𝑛.

Under the cooperative circumstances with the three-parameter contract, in order to get a win-win situation, the optimal decision from the respective of the retailer (denoted by Model (III)) should be described as follows

Model (III):max𝑞,𝑡Π𝐶𝑟(𝑞,𝑡)=𝑝𝐸(min(𝑞,𝑥))+(1𝑏)𝑣𝐸(𝑞𝑥)++𝑏𝑤𝐸(𝑞𝑥)+𝑤𝑞𝜆𝑅(𝑡),s.t.Π𝐶𝑟(𝑞,𝑡)Π𝑟𝑞𝐷,𝑡𝐷,Π(5.4)𝐶𝑚(𝑞,𝑡)Π𝑚𝑞𝐷,𝑡𝐷,𝑞>0,𝑇0𝑡𝑇𝑛.(5.5)

Equations (5.4) and (5.5) are to assure that the profits of supply chain participants under coordination are no less than those under no coordination. Equations (5.4) and (5.5) also are called the incentive compatibility (IC) constraints.

The optimal solution to the Model (III) is denoted by (𝑞𝐶,𝑡𝐶).

For the three-parameter contract (𝑏,𝑤,𝜆), we have the following conclusion.

Theorem 5.1. If the three-parameter contract (𝑏,𝑤,𝜆)meet the following conditions (5.6) to (5.8), then the supply chain will realize the supply chain coordination. (1)𝑏=(𝑝𝑣)(𝑤𝑐),((𝑝c)(w𝑣)(5.6)2)𝜆=(𝑝𝑤),Π(𝑝c)(5.7)(3)𝑐+(𝑝𝑐)𝑚𝑞𝐷,𝑡𝐷Π𝑙𝑞𝐼,𝑡𝐼Π𝑤𝑝(𝑝𝑐)𝑟𝑞𝐷,𝑡𝐷Π𝑙𝑞𝐼,𝑡𝐼.(5.8)

Proof. It is obvious that 0<𝜆<1 and 0<𝑏<1.
Since min(𝑞,𝑥)=𝑞(𝑞𝑥)+, we get 𝐸(min(𝑞,𝑥))=𝐸(𝑞(𝑞𝑥))=𝑞𝐸(𝑞𝑥)+.(5.9)
Substituting (5.9) into (5.1) and (5.3), we get Π𝐶𝑟(𝑞,𝑡)=(𝑝𝑤)𝑞+(𝑏(𝑤𝑣)(𝑝𝑣))𝐸(𝑞𝑥)+Π𝜆𝑅(𝑡),(5.10)𝐶𝑙(𝑞,𝑡)=Π𝑙(𝑞,𝑡)=(𝑝𝑐)𝑞+(𝑝𝑣)𝐸(𝑞𝑥)+𝑅(𝑡).(5.11)
Substituting (5.6) and (5.7) into (5.10) and simplifying it, we can get Π𝐶𝑟(𝑞,𝑡)=𝜆(𝑝𝑐)𝑞+(𝑝𝑣)𝐸(𝑞𝑥)+𝑅(𝑡)=𝜆Π𝐶𝑙(𝑞,𝑡).(5.12)
Substituting (5.6) and (5.7) into (5.2) and simplifying it, we have Π𝐶𝑚=(1𝜆)Π𝐶𝑙(𝑞,𝑡).(5.13)
Because 𝜆 is a constant, given parameters 𝑝,𝑤,𝑐 from (5.12), it is obvious that the optimal decision from the whole supply chain is the same as the optimal decision from the retailer. Here, we know that 𝑞𝐶,𝑡𝐶=𝑞𝐼,𝑡𝐼.(5.14)
Substituting (5.12) and (5.13) into (5.4) and (5.5); respectively, we can get 𝜆Π𝑙𝑞𝐶,𝑡𝐶Π𝑟𝑞𝐷,𝑡𝐷,(1𝜆)Π𝑙𝑞𝐶,𝑡𝐶Π𝑚𝑞𝐷,𝑡𝐷.(5.15)
Substituting (5.7) into (5.15) and using (5.14), we can get (5.8).
For a contract to be implementable, it is necessary that the contract can arbitrarily allocate the supply-chain profit between the retailer and supplier (see, e.g., Chen et al. [15], Cachon [43]). As for this question, we have the following conclusion.

Theorem 5.2. The profit of the whole supply chain system is divided into two parts by the three-parameter contract (𝑏,𝑤,𝜆), and each part of the profit embodies the supply chain participants’ value-added capacities. The three-parameter contract can arbitrarily allocate the profit of the supply chain between the manufacturer and the retailer by tuning the value of𝑤in a feasible range determined by the condition (5.8).

Proof. Substituting (5.7) into (5.12) and (5.13), we can get Π𝑟𝑞𝐶,𝑡𝐶=𝑝𝑤Π𝑝𝑐𝑙𝑞𝐼,𝑡𝐼,Π𝑚𝑞𝐶,𝑡𝐶=𝑤𝑐Π𝑝𝑐𝑙𝑞𝐼,𝑡𝐼.(5.16)
Here, 𝑝𝑐 is the profit for each product sold in the supply chain, and it can represent the value-added capacity of the supply chain; 𝑤𝑐 and 𝑝𝑤 represent the value-added capacity of the manufacturer and the retailer, respectively.
If the wholesale price changes from 𝑤to 𝑤+Δ𝑤in a feasible range determined by the condition (5.8), then the profit of the manufacturer increases (Δ𝑤/𝑝𝑐)Π𝑙(𝑞𝐼,𝑡𝐼), and the profit of the retailer decreases (Δ𝑤/𝑝𝑐)Π𝑙(𝑞𝐼,𝑡𝐼). Thus, the three-parameter contract (𝑏,𝑤,𝜆) can flexibly allocate the profits among the supply chain.

6. Numerical Analysis

To illustrate the above models and algorithms, we consider a supply chain: the retail price 𝑝=20$/unit, the wholesale price 𝑤0=10$/unit, the marginal production cost 𝑐=5$/unit, the residual value of products unsold at the end of the selling season 𝑣=3$/unit. Lead time consists of 𝑛=5 components is shown in Table 1. Here 𝛿 is an adjustable coefficient which represents a certain crashing cost. In arbitrary lead time 𝑡 (𝑇0𝑡𝑇𝑛), we use function 𝑠(𝑡)=𝛼𝑒𝛽𝑡(𝛼=140,𝛽=0.0035) to formulate the relationship between the forecast error of expected demand’s distribution and the lead time. The parameters of demand distribution are 𝜇=2000units, 𝜏=200units.

Using the algorithms introduced in Section 4.3, we can solve the Model (I) and Model (II). For some different values of 𝛿, such as 0.1, 0.5, 1, 2, 5, 6, 8, and 10, these solutions and correspondent profits of the supply chain participants and the whole supply chain are illustrated in Table 2.

As shown in Table 2, the optimal ordering quantity and lead time under the centralized decision-making scenario are different from that under decentralized decision-making scenario. From the respective of the whole supply chain, if a unit of a product is sold, it can bring 𝑝𝑐=15 $ profit to the supply chain; and if a unit of product is overstocked, it can lead to 𝑐𝑣=2 $ loss against the supply chain. Comparatively, from the respective of the retailer, if a unit of a product is sold, it can bring in 𝑝𝑤0=10 $ profit for the retailer and if a unit of product is overstocked, it can lead to 𝑤0𝑣=7 $ loss against the retailer.

It is obvious that the risk for the retailer to order more is much higher than that for the supply chain. Therefore, the retailer’s decision on order quantities tends to be conservative.

As far as lead time is concerned, the retailer can benefit from the demand forecast updates by reducing the lead time while it can bring more crashing cost to the whole supply chain. Thus, the decentralized decision from the retailer cannot be consistent with that of the centralized decision from the supply chain. Column 1 of Table 2,Δ𝑙, represents the difference of profits between the two decision-making scenarios. We can see that the decentralized decision making results in a suboptimal solution to the whole supply chain.

Hence, in order to coordinate the supply chain, risk should be distributed and shared among supply chain partners. This idea is embodied in the three-parameters contract proposed in Section 5. It makes the manufacturer and the retailer share the risk of the overstock and the crashing cost in order to maximize the profit of the whole supply chain and get a win-win situation. The parameters in the contract are developed in Table 3.

For fixed𝛿, using (5.8) and the data in Table 2, we can obtain the range of 𝑤. For example, in order to get supply chain coordination, the 𝑤 must range from 10.3025 to 10.5884 in the case of 𝛿=0.1.

For fixed 𝛿=0.1, let 𝑤 vary in the range of 10.3025 to 10.5884, then we can calculate the other two parameters in the contract with different 𝑤. Here, we can see that it is the value of 𝑤 that determines the supply chain’s profit allocation. To determine the value of 𝑤 depends on the supply chain participants’ ability to bargain.

In Table 3, Π𝐶𝑟, Π𝐶𝑚, and Π𝐶𝑙 denote the profits of supply chain participants and the whole supply chain system with coordination Δ𝑟 and Δ𝑚 denote the profit increments of the supply chain participants with coordination and Δ𝑟/Δ𝑙 and Δ𝑚/Δ𝑙 denote the ratios of the profit increments shared among the supply chain.

From Table 3, we can see that the three-parameter contract is effective and flexible to coordinate the supply chain.

7. Conclusions and Future Research

In this paper, we investigate two questions for a short-life-cycle-product supply chain, in which the forecast error of expected demand is a log-linear function of lead time, and crashing cost is a stepwise linear function of the lead time. Under this assumption and accounting for the considerations performed for the single-buyer-single-vendor supply chain, we model decisions on lead time and ordering quantity in a decentralized decision-making scenario and a centralized decision-making scenario, respectively. Then, the attributes and existence of the optimal solutions to the models are analyzed. Based on the analysis, the algorithms to solve the models are developed. To validate the algorithms and models, a numerical example is presented. The numerical result shows that the algorithms are effective. Furthermore, in order to alleviate the double margin in the decentralized decision-making scenario, a three-parameter supply chain contract is proposed to coordinate the supply chain. Through the three-parameter contract, the whole supply chain’s profit is divided into two parts. Each of them represents the single supply chain participant’s value-added capacities. The contract can arbitrarily allocate the supply chain profit between the manufacturer and the retailer by tuning the value of parameters. For this reason, it is easy for practitioners to adopt in practical.

In this study, only single product and single ordering are considered. Moreover, multiple-product supply chain is universal in practice and, with shorter lead time, more than one order can be placed. Therefore, it would be interesting to study multiple products’ scenario or multiple-order policies scenario in the future research.

Appendix

Fitting a Log-Linear Relationship between 𝑠(𝑡) and 𝑡

As shown in Figure 2, corresponding to 𝑡=0,3,6,9,12 (month), the forecast error of expected demand is𝑠(𝑡)=10,15,19,23,40 (% percentage of expected demand), respectively. Let𝑦=ln𝑠(𝑡), then the values of 𝑦 (together with 𝑡 and𝑠(𝑡)) are shown in Table 4.

Computing the coefficient between 𝑦 and 𝑡 (using the CORRCOEF function in the Statistics tool box for Matlab), we can get the following.

The coefficient matrix of 𝑦 and 𝑡 is 𝑅=1.00000.98390.98391.0000, and the 𝑃-value matrix is𝑃=1.00000.00250.00251.0000.

The result (0.00250.05) shows that there exists a significant linear correlation between 𝑦=ln𝑠(𝑡) and 𝑡at a given confidence level of 95%. This means that 𝑡 and ln𝑠(𝑡) can be written asln𝑠(𝑡)=𝑎+𝑏𝑡.(A.1) That is, 𝑠(𝑡) is log-linear function of𝑡.

Hence, denoting 𝛼=𝑒𝑎 and𝛽=𝑏, 𝑠(𝑡) may be written as𝑠(𝑡)=𝛼𝑒𝛽𝑡.(A.2)

Acknowledgments

This work is supported by the Natural Science Foundation of China under Grant no. 70872047. The authors gratefully acknowledge the helpful comments and suggestions of the editor and the anonymous reviewers which led to a substantial improvement of this paper. The authors also thank Yiliu (Paul) Tu, the professor of The Schulich School of Engineering, University of Calgary, and Ding Zhang, the professor of the School of Business, the State University of New York at Oswego, for their helpful works which have contributed to improving the readability of the paper.