A Nonlinear Multiobjective Bilevel Model for Minimum Cost Network Flow Problem in a Large-Scale Construction Project

Table 1

Information of carriers in Shuibuya Hydropower Project.

CarrierKind index Type (heaped capacity; maximum payload) Weight

Dump truck1K30N-8.4 (16  ; 26 t) 0.3
2Terex TA28 (17  ; 28 t) 0.3
3Perlini DP366 (20  ; 36 t) 0.4