A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations

Algorithm 1

Pseudocode of the Serial Schedule Generation Scheme (SSGS).
 Obtain the maximum finish time of the predecessors:
 Determine the earliest time point, , which satisfying the resource con-
 straints and .
 Set .
end while