Research Article

A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations

Figure 6

The projection of the nondominated solutions in the robustness-makespan space with different perturbation strengths: (a) perturbation strength 0.15; (b) perturbation strength 0.25; (c) perturbation strength 0.35.
786923.fig.006a
(a)
786923.fig.006b
(b)
786923.fig.006c
(c)