A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations
Figure 6
The projection of the nondominated solutions in the robustness-makespan space with different perturbation strengths: (a) perturbation strength 0.15; (b) perturbation strength 0.25; (c) perturbation strength 0.35.