Research Article

A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations

Figure 9

The obtained relative computation time (RCT) with different local search rates for P0, P8, and P15 with a perturbation strength 0.15.
786923.fig.009