Research Article
A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations
Figure 9
The obtained relative computation time (RCT) with different local search rates for P0, P8, and P15 with a perturbation strength 0.15.