Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2013
/
Article
/
Tab 4
/
Research Article
Probabilistic Value-Centric Optimization Design for Fractionated Spacecrafts Based on Unscented Transformation
Table 4
Average cost and benefit (unit: M$) in five-year lifecycle and their standard variances.
ā
Average cost
Cost standard variance
Average benefit
Benefit standard variance
Value
264.0081
32.1762
265.5474
59.9580