Research Article
An Inventory-Theory-Based Inexact Multistage Stochastic Programming Model for Water Resources Management
Table 4
Solution of the IB-IMSP model (period 1).
| Water flow level | Probability | Optimized transferring water (106 m3) | Optimized transferring batch (103 m3) | Optimized transferring period (hour) |
| L | 0.2 | | | | M | 0.6 | | | | H | 0.2 | | | |
|
|