Research Article
An Inventory-Theory-Based Inexact Multistage Stochastic Programming Model for Water Resources Management
Table 6
Solution of the IB-IMSP model (period 3).
| Water flow level | Probability | Joint flow | Optimized transferring water (106 m3) | Optimized transferring batch (103 m3) | Optimized transferring period (hour) |
| L | 0.008 | L-L-L | | | | L | 0.024 | L-L-M | | | | L | 0.008 | L-L-H | | | | L | 0.024 | L-M-L | | | | L | 0.072 | L-M-M | | | | L | 0.024 | L-M-H | | | | L | 0.008 | L-H-L | | | | L | 0.024 | L-H-M | | | | L | 0.008 | L-H-H | | | | M | 0.024 | M-L-L | | | | M | 0.072 | M-L-M | | | | M | 0.024 | M-L-H | | | | M | 0.072 | M-M-L | | | | M | 0.216 | M-M-M | | | | M | 0.072 | M-M-H | | | | M | 0.024 | M-H-L | | | | M | 0.072 | M-H-M | | | | M | 0.024 | M-H-H | | | | H | 0.008 | H-L-L | | | | H | 0.024 | H-L-M | | | | H | 0.008 | H-L-H | | | | H | 0.024 | H-M-L | | | | H | 0.072 | H-M-M | | | | H | 0.024 | H-M-H | | | | H | 0.008 | H-H-L | | | | H | 0.024 | H-H-M | | | | H | 0.008 | H-H-H | | | |
|
|
Total expected value of net benefit ($109): = [3.53, 5.03].
|