Research Article
Study on Analog Theory of Rock Mass Simulation and Its Engineering Application
Table 3
Intactness assessment of rock masses of Xiangjiaba hydropower station dam base.
| Rock quality grade |
Degree of weathering | Intactness of rock masses |
Location of distribution | Velocity of acoustic wave/m/s | RQD in the tunnel/% | RQD in the borehole/% |
| I | Unweathered | >5000 | >90 | >85 | Depth of dam base | II | Unweathered to weak weathering | 4000–5000 | 75–90 | 60–85 | Zones 1, 2, 4 | III | Moderate weathering (lower) to weak weathering | 3500–4000 | 62.5–75 | 45–60 | Zones 1, 4, 5, 6 | Moderate weathering (upper) |
3000–3500 |
50–62.5 |
30–45 | Zone 6 | Weak weathering to unweathered | Zone 3 | IV |
Weak weathering to unweathered |
2000–3000 |
25–50 |
5–30 | Zones 3, 5 | Influence band of fault and concentrated joint band | V | | <2000 | | | Shattered fault zone and weak interlayer |
|
|
Notes: The zone of the dam base is divided by six sub-zones, which are arranged in order from the right bank to left bank of the Jinsha River.
|