Research Article
An Iterative Procedure for Optimizing the Performance of the Fuzzy-Neural Job Cycle Time Estimation Approach in a Wafer Fabrication Factory
Table 12
Comparisons of the performances of various approaches.
| ā | MAE (hours) | MAPE | RMSE (hours) |
| Statistical analysis | 73 | 6.1% | 99 | CBR | 81 | 6.5% | 104 | BPN | 33 | 2.8% | 71 | SOM-WM | 30 | 2.5% | 64 | EFR | 30 | 2.6% | 65 | SOM-FBPN | 22 | 2.0% | 38 | Postclassifying FBPN | 40 | 2.7% | 88 | Bidirectional classifying BPN | 19 | 1.9% | 37 | The proposed methodology | 15 | 1.2% | 36 |
|
|