Research Article

Enhancing the Long-Term Yield Competitiveness of a Semiconductor Manufacturing Factory Using a Multiobjective Fuzzy Nonlinear Programming Approach

Table 4

The instantaneous competitiveness.

ProductCheck point number 1Check point number 2Check point number 3

(−0.077, 0.083, 0.083)(−0.082, 0.08, 0.08)(−0.098, 0.066, 0.066)
(0.002, 0.002, 0.151)(−0.009, −0.009, 0.14)(−0.037, −0.037, 0.112)
(−0.042, 0.031, 0.031)(−0.058, −0.008, −0.008)(−0.066, −0.022, −0.022)