Italian Residential Buildings: Economic Assessments for Biomass Boilers Plants

Academic Editor: Carlo Cattani
Received29 Jul 2013
Accepted19 Sep 2013
Published07 Nov 2013

Abstract

Biomass is increasingly used for energy generation since it represents a useful alternative to fossil fuel in order to face the pollutions and the global warming problem. It can be exploited for heating purposes and for supplying domestic hot water. The most common applications encompass wood and pellet boilers. The economic aspect is becoming an important issue in order to achieve the ambitious targets set by the European Directives on Renewable Sources. Thus, the present paper deals with the economic feasibility of biomass boiler plants with specific regard to an existing residential building. An Italian case study is further investigated, focusing the attention on European and national regulations on energy efficiency and considering the recent public incentives and supporting measures. The main thermoclimatic parameters—that is, heating degree days (HDDs), building thermal insulation and thermal needs—are taken into account. Moreover, the following economic indicators are calculated: cumulative cash flow, discounted cumulative cash flow, payback period (PP), net present value (NPV), Internal rate of return (IRR), discounted payback period (DPP), and profit index (PI).

1. Introduction

The problem of global warming, the growing pollutant emissions, and the increasing energy demand together with the reduction of fossil fuel sources have led many countries to consider and develop the Renewable Energy Sources sector and Europe to adopt some specific regulations on this matter [1, 2].

The European Directive 2009/28/EC—also well known as “Directive 20-20-20”—set many climate and energy targets in order to achieve and ensure a clean and sustainable living for the future generations: reduction of greenhouse gases emissions by 20%, energy production from renewable sources in percentage of 20%, and improvement of the energy efficiency by 20% in order to reduce the energy consumption [3, 4].

In this context, the biomass represents a good solution for RES developing since it is widespread in many different areas; indeed, it encompasses all organic matter of vegetable or animal origin. Biomass from plant is a product of photosynthesis process and can be considered carbon neutral since the amount of the released carbon, during its energetic conversion process, is similar to the quantity absorbed during its life time [57]. The cycle from biomass and fossil fuel to energy can be shortly represented as follows: biomass consumes CO2 through photosynthesis, which is the process used by plants and other organisms to capture sun’s energy, and the solar energy is stored in the chemical bonds of their structural components; when this energy is extracted, CO2 becomes available to produce new biomass; the process is cyclical. Burning fossil fuels, old biomass (whose conversion took millions of years), is exploited, so that new CO2 is generated through the combustion, increasing the greenhouse effect. In contrast, burning new biomass does not add new CO2 since replanting new biomass permits carbon dioxide to be absorbed and returned cyclically [8]. For this reason, biomass can be seen as a neutral fuel: combustion produces the same amount of CO2 which is absorbed during the whole life cycle of plants [9, 10]. Furthermore, during the biomass conversion into energy, low pollutants are emitted. Polycyclic Aromatic Hydrocarbons (PAHs) and CO2 emissions can be reduced by simply varying some parameters of conversion technologies [11]; moreover, since biomass has low nitrogen and sulphur contents, low emissions of and occur [12, 13]. In addition, biomass has a small content of pollutants and ashes, despite the possible variations of some chemical components and moisture [14].

In order to convert biomass into energy, several categories of processes can be exploited depending on biomass characteristics, namely, thermochemical conversion, biochemical conversion, and mechanical extraction. Direct combustion, gasification, and pyrolysis belong to the first category [15, 16]. Combustion is the most widespread process, and it mainly exploits wood biomass; the most common and commercial application is represented by biomass boiler, using wood or pellet.

In the present work, an economic assessment of a biomass boiler installation in Italian residential buildings has been investigated using the main financial indicators: cumulative cash flow, discounted cumulative cash flow, payback period (PP), net present value (NPV), internal rate of return (IRR), discounted payback period (DPP), and profit index (PI).

A two-storey single building located in Viterbo has been considered. In the current condition, the building has a methane traditional boiler for heating and domestic hot water (DHW) supply. A study on the energy improvement has been carried out considering the replacement of the methane boiler with a biomass one. The DHW demand has been covered with a solar collector. The study has been carried out on two different cases concerning the thermal insulation of the building.

Case 1. A not well thermally insulated building, for which a replacement of the fixtures and an insulation cover for the external walls have been considered in order to lead it to Case 2 conditions; in the economical assessment, the thermal insulation costs have been taken into account.

Case 2. A thermally insulated building for which the thermal insulation costs are not to be considered.

The use of the biomass boiler and the solar collector permits us to gain access to the Italian Renewable Heat Incentive. In the following paragraph, a brief description of the European and Italian Regulations and the supporting measures are reported.

1.1. European Regulations and Italian Incentive Measures

Energy efficiency improvement in Italian buildings is an extremely important aspect to ensure energy saving and green-house gases (GHGs) emissions reduction. According to ENEA, most of the dwellings in our country were built before the first law on reducing building energy consumption (Legislative Decree 373/76) came into force. More than 2.7 million residential buildings, heterogeneously distributed in the whole territory and mostly belonging to the coldest climatic areas and having a low-thermal performance building envelope, are present in Italy. This is the reason why the residential sector is characterised by the highest energy consumptions corresponding to 36% (48 262 ktoe) of the national demands and whose mean value is equal to 150–200 kWh/(m2 × year). The thermal need represents 85% of the building energy demand, including space heating (70%) and domestic hot water (15%) (year 2007) [17, 18].

Hence, in order to speed up the transition from existing heating systems towards more efficient alternatives, in recent years, many incentive schemes have been adopted in Italy [19]. In more detail on 28th December 2012 the so-called “Renewable Energy for Heating and Cooling Support Scheme” has been established; it represents the Italian Supporting Measures and implements the previous Legislative Decree number 28 of 3rd March 2011. This policy strongly encourages the use of wood and pellet boilers [20]. Indeed, according to the European Directive 2009/28, public support is needed to reach the community’s purposes on renewable energy sources (RES) use [21].

The Italian incentive mechanism carefully defines the supporting scheme for small-scale projects concerning energy efficiency improvements in existing buildings (called “category 1”) and thermal energy production by the use of RES and high efficiency systems (“category 2”), as shown in Tables 1 and 2. The term “replacement” means the substitution of an existing power system with a new solution, whose capacity must not exceed more than 10% of the old system. If this constraint is not respected, the corresponding incentive will not be awarded [20].


Project identification codeEligible projects

1.AThermal insulation of opaque enclosures
1.BReplacement of transparent enclosures
1.CReplacement of existing winter heating systems with condensing heat generator
1.DShadowing and shielding systems for transparent enclosures


Project identification codeEligible projects

2.AReplacement of existing winter heating systems with heat pumps, whose thermal capacity must be less than 1000 kW
2.BReplacement of existing heating or cooling systems for greenhouses or agricultural buildings with heat generators supplied by biomass, whose thermal capacity must be less than 1000 kW
2.CSolar thermal collector, whose total area must not exceed 1000 m2
2.DReplacement of electrical boilers with heat pump boilers

According to the national regulation, two different parties are eligible, namely, public administrations and private parties. The first parties may apply for both categories, while private parties may require incentives only for category 2. Moreover, focusing the attention on new buildings or on those subject to major renovation, the supporting measure will cover only the part of the project exceeding the mandatory targets set by Legislative Decree number 28. The supporting measures will be granted only for those projects which do not benefit other incentives from the government [20].

In order to further improve the energy efficiency in new or existing buildings—both for thermal behaviour and heating/cooling systems—it is fundamental to analyse the thermal and electrical needs. This goal is successfully reached by carrying out the so-called Energy Performance Certificate (EPC) which was laid down by the European Directive 2002/91. With regards to the regulation, “energy performance of a building” is meant as the amount of energy actually consumed or estimated to meet the different needs associated with a standardised use of the building itself, which may include heating, hot water heating, cooling, ventilation, and lighting. When buildings are constructed, sold, or rented out, the EPC is made available to the owner or by the owner to the prospective buyer or tenant, as the case might be. The validity of the certificate should not exceed 10 years [22].

The above-mentioned regulation was repealed by the European Directive 2010/31 with effect from 1 February 2012. Since buildings account for 40% of total energy consumption in the Union and the sector is still expanding, member states should ensure that all new buildings occupied and owned by public authorities are nearly zero-energy buildings, by 31 December 2020 and 31 December 2018, respectively. In more detail, a “nearly zero-energy building” is referred to, a very high energy performance structure as determined in accordance with Annex I. A very limited amount of energy required should be covered—to a very significant extent—by energy from renewable sources, especially on-site or nearby [23].

The European Directive 2012/27 establishes a common framework of measures for promoting energy efficiency within the Union in order to ensure the achievement of the Union’s 2020 20% headline target on energy efficiency and to pave the way for further energy efficiency improvements beyond that date [24].

With specific regard to Italy, the concepts of energy savings in buildings, rational utilisation of energy, and sustainable use of RES were introduced by the National Law 10/91 [25]. In recent years, the legislative framework has been further developed and is still changing in order to comply with the above-described European Directives. The following national regulations must be taken into account to carry out the Energy Performance Certificate.(i)Legislative Decree 192/05 on energy efficiency of buildings [26].(ii)Legislative Decree 311/06 which encompasses corrections and integrations to the Legislative Decree 192/05 [27].(iii)Presidential Decree 59/09 which enforced Legislative Decree 192/05 [28].(iv)National guidelines for energy performance set by the Ministerial Decree 26/06/2009 [29].(v)Ministerial Decree 22/11/2012, including corrections and integrations to the Ministerial Decree 26/06/2009 [30].

In order to benefit the incentives laid down by the Renewable Energy for Heating and Cooling Support Scheme, the EPC must be carried out in case of replacement of existing winter heating systems with biomass boiler if the renovation is applied to the whole building, having a nominal power more than 100 kW.

2. Materials and Methods

The system considered in the present study consists of a single building located in Viterbo (Northern Latium, Central Italy). The structure is a 2-storey, rectangular-shaped building, with external gross dimensions of 6 m × 10 m. The total footprint area is 102 m2, leading to a total heated volume of 275.4 m3 since each floor is 2.7 m high. External walls are made of 28 cm of brick elements, without any insulation cover. Moreover, an internal and external layer of plaster—whose thickness is equal to 20 mm in both cases—is added. Table 3 shows the main thermal parameters of the current wall layers in the building. The roof and the ground floor consist of ordinary concrete structure. Windows are 1 or 2 double glass panes-solutions with wooden frame and are located in the eastern, southern, and western sides of the considered dwelling. The overall thermal transmittance of the transparent enclosures is equal to 2.8 W/(m2 × K). Windows account for 19.48 m2, corresponding to 10% of the external wall surface. Space heating and domestic hot water (DHW) are supplied by means of a 24 kW methane-traditional heat generator, whose parameters are summarized in Table 4. The heat distribution system is ensured by traditional radiators. The building in this condition represents the studied Case 1 in the present paper.


MaterialsThickness (mm)Thermal conductivity (W/m × K)Density (kg/m3)Resistance factor (dimensionless)Specific heat (J/kg ×  °C)Thermal resistance (m2  × K/W)Overall thermal transmittance (W/m2  × K)

Internal plaster200.351200108350.0571.642
Brick2800.7771800158350.36
External plaster200.91800208350.022


ParametersValues

Nominal power for heating (min/max)11.0/24.6 kW
Nominal power for DHW (min/max)11.0/24.6 kW
Useful power output (min/max)9.6/22.9 kW
Temperature range for heating82/40°C
Temperature range for DHW60/36°C
Efficiency considering the nominal power93.0%
Efficiency considering 30% of the nominal power92.8%

Since the dwelling is represented by a residential building (belonging to category E1 according to the Presidential Decree 412/93), the set point for indoor temperature is assumed to be equal to 20°C to ensure thermal comfort [31].

Broadly speaking, the working period of the heating systems depends on climatic conditions and on the so-called heat degree days (HDDs). The heating requirements for a given structure at a specific location are considered to be directly proportional to the number of HDDs at that location. HDDs are defined relative to a base temperature which is the outside temperature above which a building does not need heating. In order to evaluate HDD, an approximation method is used by taking the average temperature on any given day and subtracting it from the base temperature. If the value is less than or equal to zero, that day has zero HDD; if the value is positive, that number represents the number of HDDs on that day. Thus, only the positive differences of temperature must be considered. HDDs are calculated with (1) [32] as follows: where is value varying from 1 to the number of heating days (nhd), is the base temperature (°C), and is the mean daily external temperature (°C). According to the value given by (1), Italy is divided into six different areas—from zone A (the hottest one) to zone F (the coldest one)—as shown in Table 5. More precisely, HDDs increase when the climate becomes colder. Viterbo belongs to zone D, having 1989 HDDs.


Climatic areaHDDMaximum heating hours per dayHeating period

A<6006December 1–March 15
B601–9008December 1–March 31
C901–140010November 15–March 31
D1401–210012November 1–April 15
E2101–300014October 15–April 15
F>3000No limitationsNo limitations

Considering all the input data mentioned in Tables 3, 4, and 5, the software DoCeT has been used in order to calculate the total primary energy consumption for space heating, DHW, and electrical purposes and, as a consequence, the energy class of the building. The obtained results are summarized in Table 6 [33].


Output dataCase 1

Primary energy for space heating299.5 kWh/m2
Primary energy for DHW 21.8 kWh/m2
Primary energy for electrical uses4.1 kWh/m2
Total primary energy consumption325.4 kWh/m2
Thermal need for space heating204.9 kWh/m2
Thermal need for DHW17.1 kWh/m2
Cooling need18.6 kWh/m2
Global energy class (space heating and DHW)G
Partial energy class with regard to heating and coolingG
Building envelope performance II
Partial energy class with regard to DHWE
CO2 emissions88.2 kg/m2

In order to improve the energy and thermal performance of the building, the following actions can be carried out:(i)insulation layer within the external wall;(ii)supplying DHW demand by installing solar collectors on the roof;(iii)providing space heating and DHW by means of a pellet boiler.

With specific regard to the first stage, Tables 7 and 8 show the main thermal parameters of the building in case of insulating the external wall and the improvements of the building envelope in terms of thermal behaviour. In order to access the 65% tax deduction regulation, the overall transmittance of the wall must not exceed the limit values reported in the Ministerial Decree 59/09, if the project is carried out in climatic areas belonging to classes C, D, E, and F [34].


MaterialsThickness (mm)Thermal conductivity (W/m × K)Density (kg/m3)Resistance factor (dimensionless)Specific heat (J/kg ×  °C)Thermal resistance (m2  × K/W)Overall thermal transmittance (W/m2 × K)

Internal plaster200.351200108350.0570.359
Brick2800.7771800158350.36
Insulating layer500.023388990013922.174
External plaster200.91800208350.022


Overall transmittance Case 1post operam and Case 2 (W/m2 × K)Limit value according to Presidential Decree 59/2009Overall transmittance Case 1ante operam (W/m2 × K)Overall transmittance reduction (W/m2 × K)

0.3590.361.642−1.283

The transparent enclosures may be replaced by double glass panes-solutions with PVC frame, whose overall thermal transmittance is given by 1.1 W/m2 × K.

An energy analysis has been carried out with DoCet software for the thermally insulated building too, considering a methane boiler for heating and DHW supply. The building in these conditions represents Case 2 studied in the present paper. The results are reported in Table 9.


Output dataCase 2

Primary energy for space heating160 kWh/m2
Primary energy for DHW 21.8 kWh/m2
Primary energy for electrical uses4.1 kWh/m2
Total primary energy consumption186 kWh/m2
Thermal need for space heating102 kWh/m2
Thermal need for DHW17.1 kWh/m2
Cooling need19.7 kWh/m2
Global energy class (space heating and DHW)F
Partial energy class with regard to heating and coolingF
Building envelope performance II
Partial energy class with regard to DHWE
CO2 emissions37 kg/m2

For both Cases 1 and 2, the installation of solar collectors and pellet boiler has been evaluated in order to enhance the energy properties of the building.

The solar collectors to be located on the roof have been preliminarily designed assuming 4 occupants and 50 L/person as water demand. This leads us to calculate the collector surface (3 m2) and the diameter of the pipe within the collector (16 mm). The tank volume is equal to 220 L.

As for the heating system, the chosen biomass boiler has the characteristics reported in Table 10 (according to UNI EN 303-5-2012 standard).


CharacteristicsValues

FuelPellet
Rated power ( )12 kW
Efficiency93%
Consumption0.9–2.75 kg/h
Heatable volume315 m3
Water buffer tank600 L

Considering all the above-mentioned input data and the results coming from the design procedures, the software DoCeT has leds us to calculate an approximate estimation of the total primary energy consumption for space heating, DHW, and electrical purposes and, as a consequence, the energy class of the buildings in post operam conditions, as summarized in Table 11 [33].


Output dataValues

Primary energy for space heating137.3 kWh/m2
Primary energy for DHW0 kWh/m2
Primary energy for electrical uses4.2 kWh/m2
Total primary energy consumption141.5 kWh/m2
Thermal need for space heating102 kWh/m2
Thermal need for DHW17.1 kWh/m2
Cooling need19.7 kWh/m2
Global energy class (space heating and DHW)E
Partial energy class with regard to heating and coolingF
Building envelope performance II
Partial energy class with regard to DHWA
CO2 emissions0.3 kg/m2

The chosen solar collectors and biomass boiler fulfil the technical requirements set by the Renewable Energy for Heating and Cooling Support Scheme.

With specific regard to the cases described, the EPC is not needed. However, it has been carried out since it is fundamental to understand the current energy class of the dwelling and the future and possible improvements by modifying the building envelope and the energy supply plants [19]. As it is commonly known, the energy efficiency is given on a scale from A+—the most efficient homes—to G—the most energy consuming one. According to the national regulations, the EPC can be successfully carried out using the software DoCeT in case of existing residential buildings whose total area does not exceed 3000 m2 [2631].

The biomass boiler fulfils the technical requirements set by the support scheme, such as the observance of class 5 of the EN 303-5 technical standard, the efficiency higher than , and the observance of the pellet characteristics according to classes A1 and A2 of EN 14961-2.

According to the Italian supporting measures, the incentive for biomass boilers has been calculated as follows [20]: where is the yearly awarded incentive (€/year), is thermal power of the plant (kW), is the utilization coefficient in hours (Table 12), is a coefficient depending on the thermal power of the plant (Table 13), is a coefficient depending on the particulate emissions (Table 14).


Climatic zone (hours)

A600
B850
C1100
D1400
E1700
F1800


<35 KW35–500 kW>500 kW

Biomass boilers0.045 [€/ ]0.020 [€/ ]0.018 [€/ ]


PPBT (mg/Nm3)

20 < emissions ≤ 301
10 < emissions ≤ 201.2
emissions ≤ 101.5

The primary particulate emissions can be determined by following the CEN/TS 15883 or EN 13284-1 standards and with a formula described in Decree 28th December 2012.

The parameters and the yearly incentive for the biomass boiler are reported in Table 15.


ParametersValues

907.2 €/year
12 kW
1400 hours
0.045 €/kWh
1.2
PPBT10 ÷ 20

The yearly incentive awarded for the installation of the solar collectors is reported in Table 16 and is defined by the following formula [20]: where is the gross surface of the solar collectors (m2) and is a coefficient depending on the total surface of the system.


ParametersValues

510 €/year
170 €/m2
3 m2

Thus, the total yearly incentive is 1 417.2 €/year, and it is dispensed in two years.

Furthermore, private parties might benefit of the supporting measures for the energy efficiency improvement in the existing residential buildings by accessing the so-called “65% tax deduction,” laid down by the recent Legislative Decree number 63 of 6th June 2013. The latter awards incentives for those projects which will be carried out until 31st December 2012 or 30th June 2014 in case of block apartments and involving the building envelope (both opaque and transparent enclosures), the installation of solar collectors, or the replacement of existing heating generators by means of a condensing boiler [34]. Thus, the tax deduction on the thermal insulation of the building has been taken into account for the studied Case 1.

3. Results

All costs for the above-described installations are reported for both Cases 1 and 2 in Table 17.


ReferencesComponentsCostsTotal (€)Operating maintenance (€)

Market researchPellet boiler2750 €2750100
Market researchWater buffer tank1300 €13006.5
Latium region price list 2012 CODES A.11.02.1.c1 A.11.02.1.c2Thermal insulation for external walls (Polyiso)40.16 €/m2
(up to 2 cm)
2.83 €/m2
(for additional cm)
8393
Latium region price list 2012 CODE E.1.17.4Solar collector516.46 €/m21549.38
Market researchWater tank1250 €12507.74
Latium region price list 2012 CODE A.16.01.a-b-c-dTransparent enclosures380 €/m2702

Total costs Case 122645127
Total costs Case 26850127

The energy consumption costs before and after installing biomass boiler and solar collector are reported in Table 18 for both Cases 1 and 2.


Energy consumption before installing biomass boiler and solar collector
Consumption (kWh/year)Cost of methane (€/kWh)Total (€/year)

Case 1
Heating + DHW20899.80.0932105.9
Case 2
Heating + DHW12148.2 0.0931129.78

Energy consumption after installing biomass boiler and solar collector
Consumption (kWh/year)Pellet cost (€/kWh)Total (€/year)

Heating + DHW12148.20.058704

The benefits of the investment are shown for both cases in Table 19.


Benefits€/yearPeriod

Italian renewable heat incentive for biomass boiler907.22 years
Italian renewable heat incentive for solar collector5102 years
65%-tax deduction—thermal insulation for external walls—Case 1545.5510 years
65%-tax deduction—transparent enclosures—Case 1481.1310 years
Annual cost saving for energy production—Case 2425.2
Annual cost saving for energy production—Case 11401.3

All the above-listed costs and benefits are useful in order to calculate the main financial parameters.

The cash flows () are obtained by adding all the costs () and all the profits () related to the generic th year, as shown in (4) [3] as follows:

The discounted cash flows have been calculated by [3] where represents the weighted average cost of capital (WACC). It refers to the index which defines the average expected return considering the assets of the plant’s owner. The cumulative cash flow and the discounted cumulative cash flow are reported in Figures 1, 2, 3, and 4.

It can be easily seen that the payback period (PP) of the investment is 9 years for Case 1 and 13 for Case 2.

The net present value (NPV) has been evaluated using [3] where is the lifetime of the investment, considered equal to 20 years.

The discounted payback period (DPP) can be observed in Figures 5 and 6.

The internal rate of return (IRR) can be calculated through the following conditions:

The values of the IRR can be observed in Figures 7 and 8.

The profitably index has been calculated using the following:

The main financial parameters are summarized in Table 20.


Case 1
Lifetime of the investment20 years
PP9 years
NPV10170.11 €
DPP10 years
IRR7.5%
PI1.41

Case 2
Lifetime of the investment20 years
PP14 years
NPV782.12 €
DPP15.7 years
IRR3.7%
PI1.08

4. Conclusion

Two analyses have been carried out in order to assess the economical feasibility of biomass boiler plants in standard Italian residential buildings located in Viterbo. The first case studied concerns a not well thermally insulated building for which the following actions have been considered: energy efficiency improvement through insulation of the external walls and replacement of the transparent enclosures; installation of a solar collector to supply DHW; and installation of a pellet boiler to provide space heating and DHW if needed. The second case studied involves the same thermally insulated building for which the actions concern the solar collector and pellet boiler installations only.

All the installations fulfil the technical requirements set by the Italian Renewable Energy for Heating and Cooling Support scheme (Decree 28th December 2012) and 65% tax deduction (Legislative Decree no. 63 of 6th June 2013).

The supporting measures permit us to obtain good economic indicators for Case 1 which represents the condition with the highest investment costs. This is possible especially thanks to the 65% tax deduction and to the consumption reduction due to the energy efficiency improvement of the building.

In both studied cases, the major advantages are due to the energy and economic saving achieved with solar collector and pellet boiler installation compared to the use of the methane boiler.

However, the economic subsidy represents a fundamental tool for the payback period reduction and the dissemination of renewable energy sources for heating purposes and domestic hot water supply.

Acknowledgment

Ming Li acknowledges the support in part by the National Natural Science Foundation of China under the project Grant numbers 61272402, 61070214, and 60873264.

References

  1. S. Cocchi, S. Castellucci, and A. Tucci, “Modeling of an air conditioning system with geothermal heat pump for a residential building,” Mathematical Problems in Engineering, vol. 2013, Article ID 781231, 6 pages, 2013. View at: Publisher Site | Google Scholar
  2. M. Carlini and S. Castellucci, “Efficient energy supply from ground coupled heat transfer source,” in Proceedings of the ICCSA, vol. 6017 of Lecture Notes in Computer Science, pp. 177–190, 2010. View at: Google Scholar
  3. E. M. Mosconi, M. Carlini, S. Castellucci, E. Allegrini, L. Mizzelli, and M. Arezzo di Trifiletti, “Economical assessment of large scale photovoltaic plants: an Italian case study,” in Proceedings of the ICCSA, vol. 7972 of Lecture Notes in Computer Science, pp. 160–175, 2013. View at: Google Scholar
  4. European Directive 2009/28/EC.
  5. M. Carlini, S. Castellucci, S. Cocchi, and A. Manzo, “Waste wood biomass from pruning of Urban Green in viterbo town: energy characterization and potential uses,” in Proceedings of the ICCSA, vol. 7972 of Lecture Notes in Computer Science, pp. 245–255, 2013. View at: Google Scholar
  6. A. Di Carlo, D. Borello, and E. Bocci, “Process simulation of a hybrid SOFC/mGT and enriched air/steam fluidized bed gasifier power plant,” International Journal of Hydrogen Energy, vol. 38, pp. 5857–5874, 2013. View at: Google Scholar
  7. A. Di Carlo, E. Bocci, and V. Naso, “Process simulation of a SOFC and double bubbling fluidized gasifier power plant,” International Journal of Hydrogen Energy, vol. 38, pp. 532–542, 2013. View at: Google Scholar
  8. P. McKendry, “Energy production from biomass (part 1): overview of biomass,” Bioresource Technology, vol. 83, no. 1, pp. 37–46, 2002. View at: Publisher Site | Google Scholar
  9. E. Biagini, F. Barontini, and L. Tognotti, “Devolatilization of biomass fuels and biomass components studied by TG/FTIR technique,” Industrial and Engineering Chemistry Research, vol. 45, no. 13, pp. 4486–4493, 2006. View at: Publisher Site | Google Scholar
  10. A. Di Carlo, E. Bocci, and A. Dell'Era, “Comparison by the use of numerical simulation of a MCFC-IR and a MCFC-ER when used with syngas obtained by atmospheric pressure biomass gasification,” International Journal of Hydrogen Energy, vol. 36, no. 13, pp. 7976–7984, 2011. View at: Publisher Site | Google Scholar
  11. A. T. Wijayanta, M. Saiful Alam, K. Nakaso, J. Fukai, and M. Shimizu, “Optimized combustion of biomass volatiles by varying O2 and CO2 levels: a numerical simulation using a highly detailed soot formation reaction mechanism,” Bioresource Technology, vol. 110, pp. 645–651, 2012. View at: Publisher Site | Google Scholar
  12. Z. Li, W. Zhao, R. Li, Z. Wang, Y. Li, and G. Zhao, “Combustion characteristics and NO formation for biomass blends in a 35-ton-per-hour travelling grate utility boiler,” Bioresource Technology, vol. 100, no. 7, pp. 2278–2283, 2009. View at: Publisher Site | Google Scholar
  13. S. Sethuraman, C. V. Huynh, and S.-C. Kong, “Producer gas composition and NOx emissions from a pilot-scale biomass gasification and combustion system using feedstock with controlled nitrogen content,” Energy and Fuels, vol. 25, no. 2, pp. 813–822, 2011. View at: Publisher Site | NOx%20emissions%20from%20a%20pilot-scale%20biomass%20gasification%20and%20combustion%20system%20using%20feedstock%20with%20controlled%20nitrogen%20content&author=S. Sethuraman&author=C. V. Huynh&author=&author=S.-C. Kong&publication_year=2011" target="_blank">Google Scholar
  14. W. Heschel, L. Rweyemamu, T. Scheibner, and B. Meyer, “Abatement of emissions in small-scale combustors through utilisation of blended pellet fuels,” Fuel Processing Technology, vol. 61, no. 3, pp. 223–242, 1999. View at: Google Scholar
  15. D. Monarca, A. Colantoni, M. Cecchini, L. Longo, M. Carlini, and A. Manzo, “Energy characterization and gasification of biomass derived by hazelnut cultivation: analysis of produced syngas by gas chromatography,” Mathematical Problems in Engineering, vol. 2012, Article ID 102914, 9 pages, 2012. View at: Publisher Site | Google Scholar
  16. A. Monarca, M. Cecchini, A. Colantoni, and A. Marucci, “Feasibility of the electric energy production through gasification processes of biomass: technical and economic aspects,” in Proceedings of the ICCSA, vol. 6785 of Lecture Notes in Computer Science, pp. 307–315. View at: Google Scholar
  17. M. Citterio, B. Dipietra, and F. Margiotta, “Recupero Energetico dell’Edilizia Sociale, Potenzialità e opportunità, il caso di edifici ATC di Biella,” VIII Congresso Nazionale CIRIAF—Sviluppo Sostenibile e Tutela dell’Ambiente e della Salute Umana, 2008. View at: Google Scholar
  18. Italian Regulation, Legge 373/76.
  19. M. Villarini, M. Limiti, and R. Impero Abernavoli, “Overview and comparison of global concentrating solar power incentives schemes by means of computational models,” in Proceedings of the ICCSA, vol. 6785 of Lecture Notes in Computer Science, pp. 258–269, 2011. View at: Google Scholar
  20. Italian Regulation, D.M. 28 dicembre 2012.
  21. European Directive 2009/28/EC.
  22. European Directive 2002/91/EC.
  23. European Directive 2010/31/EC.
  24. European Directive 2012/27/EU.
  25. Italian Regulation, Legge 10/91.
  26. Italian Regulation, Decreto Legislativo 192/05.
  27. Italian Regulation, Decreto Legislativo 311/06.
  28. Italian Regulation, Decreto Legislativo 59/09.
  29. Italian Regulation, D.M. 26 giugno 2009.
  30. Italian Regulation, D.M. 22 novembre 2012.
  31. Italian Regulation, D.P.R. 412/1993.
  32. M. Carlini, S. Castellucci, E. Allegrini, and A. Tucci, “Down-hole heat exchangers: modelling of a low-enthalpy geothermal system for district heating,” Mathematical Problems in Engineering, vol. 2012, Article ID 845192, 11 pages, 2012. View at: Publisher Site | Google Scholar
  33. Software DOCET Manual.
  34. Italian Regulation, Decreto legge 4 giugno 2013, n. 63.

Copyright © 2013 Maurizio Carlini et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

933 Views | 561 Downloads | 7 Citations
 PDF  Download Citation  Citation
 Download other formatsMore
 Order printed copiesOrder