Research Article

Operational Impacts of Using Restricted Passenger Flow Assignment in High-Speed Train Stop Scheduling Problem

Table 1

Line or section information of study HSR network.

HSR line or sectionThe year in operationApproximate length (km)Speed classification (km/h)

Jinghu (1-18)20111,318350
Jingshen (1-19)676350
Jiaoji (21-20)2008362200~250
Shijiazhuang-Dezhou180250
Shitai (22-23)2009190250
Zhengxu (24-9)360350
Zhengxi (24-25)2010458350
Hening (26-13)2008166200
Hewu (26-27)2008356200
Wuhan-Chengdu1,260200
Huhang (18-29)2010158350

“—” indicates that the rail line or section is planned or not completely in operation.